Earnings Labs

AerSale Corporation (ASLE)

Q2 2022 Earnings Call· Mon, Aug 8, 2022

$6.82

-0.22%

Key Takeaways · AI generated
AI summary not yet generated for this transcript. Generation in progress for older transcripts; check back soon, or browse the full transcript below.

Same-Day

+10.44%

1 Week

+11.37%

1 Month

+18.83%

vs S&P

Transcript

Operator

Operator

Greetings. Welcome to AerSale Inc., Second Quarter 2022 Earnings Conference Call. [Operator Instructions]. I would now like to turn the conference over to your host, Kristen Gallagher. Please go ahead.

Kristen Gallagher

Analyst

Good afternoon. I'd like to welcome everyone to AerSale's second quarter 2022 earnings call. Conducting the call today are Nick Finazzo, Chief Executive Officer and Martin Garmendia, Chief Financial Officer. Before we discuss this quarter's results, we want to remind you that all statements made on this call that do not relate to matters of historical fact should be considered forward-looking statements within the meaning of the federal securities laws including statements regarding our current expectations for the business and our financial performance. These statements are neither promises nor guarantees, but involve known and unknown risks, uncertainties and other important factors that may cause our actual results, performance or achievements to be materially different from any future results. Important factors that could cause actual results to differ materially from forward-looking statements are discussed in the Risk Factors section of the company's annual report on Form 10-K for the year ended December 31, 2021, and filed with the Securities and Exchange Commission on March 15, 2022, and its other filings with the SEC. These filings identify and address other important risks and uncertainties that could cause actual events and results to differ materially from those indicated by the forward-looking statements on this call. We'll also refer to non-GAAP measures that we view as important in assessing the performance of our business. A reconciliation of those non-GAAP metrics to the nearest GAAP metric can be found in the earnings presentation materials made available on the Investors section on the AerSale website at ir.aersale.com. With that, I'll turn the call over to Nick Finazzo.

Nicolas Finazzo

Analyst

Thank you, Kristen. Good afternoon and thank you for joining our call today. I'll begin with a brief overview of the quarter and operational updates. And I'll then turn the call over to Martin to review the numbers. We produced another record quarter for AerSale with total sales of 139.6 million, which was up 51.9% compared to the prior year, and adjusted EBITDA that was up 35.2% to 41.1 million. Notably, this higher profitability was achieved despite the absence of 8.4 million in CARES Act payroll support proceeds that were received in the prior year as a result of the pandemic. This exceptional performance was achieved primarily through the broad-based success of our Boeing 757 passenger to freighter conversion program, which I'll refer to as P2F, combined with an improving backdrop of commercial demand for use serviceable material, which I'll refer to as USM parts. This notwithstanding, we think it is important to remind investors that our business can and will be lumpy quarter-to-quarter depending on flight equipment transactions during the period. This will be the case in 2022. As a disproportionate amount of flight equipment transactions occurred in the first half of the year. Turning to segment performance and beginning with asset management. Second quarter sales were 114.5 million, which marks an increase of 90% over the prior year. We sold a total of 92.5 million of flight equipment during the period, which included three aircraft, two of which were AerSale P2F converted 757s, a 747-400 freighter and three engines. While we do expect the pace of flight equipment sales to moderate substantially in the second half, based on delivery schedules, we remain positioned to continue the 757 P2F program through early 2024. Besides the six P2F conversions utilizing AerSale's Goodyear facility, we have committed to perform another 12…

Martin Garmendia

Analyst

Thanks, Nick. I will start with an overview of our second quarter financial performance and end with our guidance for 2022. Our second quarter revenue was 139.6 million, which included 92.5 million of flight equipment sales. Revenue in the second quarter of 2021 was 91.9 million and included 42.7 million of flight equipment sales. Second quarter Asset Management Solutions revenue increased to 114.5 million from 60.3 million in the second quarter of 2022. Primarily on account of the flight equipment sales mentioned before. U.S. and parts sales also improved due to the pent-up demand and the ongoing recovery in passenger travel as compared to the prior year period. In addition, our leasing business benefited from higher volume and utilization of our leased flight equipment. Within our U.S. and parts business, we see an increasingly favorable market for feedstock availability, against the backdrop of growing demand for airframe and engine parts as airline USM parts consumption expands. In addition, demand for 757 P2F converted aircraft is expected to remain strong, and we are well positioned to monetize on an additional 12 aircraft 10 in 2023 and 2 in early 2024. Second quarter revenue from TechOps was 25.1 million, compared to 31.6 million in the second quarter of 2021. That decline in revenue largely reflected lower storage maintenance at Roswell and Goodyear facilities as the return of aircraft by airlines into operations continued. In addition, we have reduced third-party capacity at our Goodyear facility due to the company 757 P2F conversion program. As you're aware, we have been able to generate higher margins from the sale of five internally converted 757s since the second half of 2021 as a result of this reallocation. We expect one additional internal conversion to be completed and sold in the remainder of 2022, after which we…

Operator

Operator

Thank you. [Operator Instructions]. The first question we have is from Gautam Khanna from Cowen. Please go ahead.

Gautam Khanna

Analyst

Hi, good afternoon guys. I was wondering if you could elaborate on the AerAware order you placed with Universal. And could just talk about how once it's approved by the FAA, and once an airline has placed an order how quickly can these actually be manufactured and installed, and just sort of what's the process around that you're planning for now?

Nicolas Finazzo

Analyst

Okay. I'm sure. Gautham, good afternoon. So the order that we made with Elbit Universal for AerAware components is to ensure that we have a substantial amount of equipment that we can start delivering and do a complete conversion process. That means not only doing the installation where we modify the radome, we put the wire harnesses on the airplane and we mount the eye tracker, we put a location in the eyebrow bin or we make an eyebrow bin to store the head wearable display. And we mount everything through the system tests, calibrate, and basically issue the supplemental type certificate authorization for that specific aircraft. So we've got to do all of that in anticipation of being able to install a fleet full of completed systems. So first step is for us to do all of the work that I just described, concurrently with doing that work, which we believe can be done over a several day period would be the installation of those components. However, the components other than an installation set to certify the aircraft, we don't need to have the components in hand or at least a large order of components to start delivering on AerSale’s half of sale of an AerAware converted aircraft. We just need to have enough -- we just need to have our installation kit, modified radon, et cetera perform and several sets of components so that we can certify an aircraft. And then, if it's a large order, and it may take several months or depending on the size of the order, it could take years to develop enough to build enough hardware to comply with an order of potentially 1000s of aircraft, that wouldn't affect our ability to start doing our portion of the conversion. And for us for AerSale to start making sales. Once the hardware became available, we think on an overnight once the aircraft were certified, had all of the -- was setup basically to accept all of the components that Elbit Universal remanufacturing, then we believe we could do the reinstallation of just the hardware on an overnight. So if we had a huge order, we could do our part. When Elbit Universal eventually catches up on manufacturing of the component pieces, we then could install the component pieces. And that would really complete there half of the complete installation. But our half would already have been done.

Gautam Khanna

Analyst

Okay, interesting. And do you guys have any greater clarity on whether the FAA still requires that over half of the operators fleet have the AerAware system if they're going to fly them? Or is it -- has that changed at all?

Nicolas Finazzo

Analyst

That's not changed yet. Our understanding is now whether that's an operator requirement or an FAA requirement, we're still not sure we're hearing it's an FAA requirement. But it makes sense that before an operator would release a new system into their operation, that they would have all the pilots trained on the system, they would have enough equipment installed in the aircraft so that as pilots are rotating from one aircraft to another, that they hop into an airplane with AerAware installed, they already been trained, they know how to use it, and there's enough aircraft flying around out there to get some proficiency using it. So whether it's an FAA requirement or not, I think it's prudent that the airlines, wait until they get half their fleet modified before they start using the system.

Gautam Khanna

Analyst

Okay. And do you guys have a timetable on when the earliest as soon as you might actually get approval? And how is it gone, I think it just kind of described your interactions with the regulatory bodies since the software package was finalized and submitted?

Nicolas Finazzo

Analyst

So a few weeks ago, we conducted another round of familiarization flights with the Human Factors area of the FAA what those guys do is, those are engineers working for the FAA that actually verify that the pilots wearing this head wearable display, can wear it comfortably that they can use it doesn't interfere with their operation other systems in the aircraft. And the reason that they had requested that the human factors people had requested us to do to take them up on some demonstration, familiarization flights, is because they want it to be ready, so that when we actually started our certification flights, they were already familiar with the system, because we've already that was our third set of tests flying with different people from the FAA, some out of the Atlanta region, some out of the Seattle region, and now the Human Factors people. So we think that all of the required engineers and test pilots with the FAA that are going to participate in our certification place, we believe that they've already seen the aircraft and understand how it works. And they'll be able to check the boxes to validate that the airplane does see through the weather. It does all the things that we say it's going to do that it functions correctly, it doesn't interfere. And that when we do the certification flights, it's really just -- it's final check to boxes. We think we've demonstrated the system now effectively to all of that people at the FAA that will ultimately approve it for us. So we're extremely optimistic that we're -- we're on the homestretch now.

Gautam Khanna

Analyst

Okay. And last one, before I turn it over, I just wanted to ask, you mentioned that the market for acquiring USM seems to be showing some life and that some of the competition is waning a bit. So maybe it's more of a buyers-market. I was wondering if you could elaborate on kind of what's in your pipeline of pursuits, maybe just by size, are you in fact seeing a more rational market right now in terms of bids that are prevailing and/or who is actually in the market competing against you, for these assets? Any color there would be helpful? Thank you.

Nicolas Finazzo

Analyst

So we do feel that, whereas it has been a seller's market that that seller's market is starting to wane. Leasing companies and airlines that have looked, trying to determine what to do with their idle equipment, leasing companies now who have kept aircraft in storage, and have not found customers to operate those aircraft. Again, our after 2.5 years of writing them down, have gotten them to the point where they're going to keep whether it be engines or APUs, or landing gear or whatever they're going to take -- going to take the equipment that they feel that they're going to need in the near term off those aircraft, and they're going to sell those aircraft into the into our market. So we're seeing that more and more we're getting whatever, it could be a whole aircraft, it could be an aircraft with one engine, it could be an aircraft with no engines and no landing gear, or run out landing gear. So we're really perfectly positioned to acquire that type of flight equipment because we know what to do with an airframe that's missing an engine or an airframe that's missing a landing gear. Because we or had to run out landing gear that's coming with it because we have overhauled capability for the landing gear, we're putting engines through the shop that we're buying on serviceable, we've got the infrastructure to basically restore an aircraft that still has life left, based on the multi-dimensional infrastructure that we've created over the last decade. And that's what sets us apart from our one dimensional competitors or financial buyers who want to come into this space, they have cash, maybe they have somebody that has some experience in the market, but they don't have the overall breadth of capacity…

Gautam Khanna

Analyst

Thank you.

Nicolas Finazzo

Analyst

Welcome.

Operator

Operator

[Operator Instructions]. Ladies and gentlemen, it seems we have reached the end of our question-and-answer session. And I would like to turn the call back to Nick Finazzo for closing remarks.

Nicolas Finazzo

Analyst

Okay, thank you. So we've had another record quarter and that's great. But we're just performing exactly as we expected, maybe a little ahead, because we were able to close the 747 transaction that we thought was going to take place in the third quarter and instead, it happened at the very end of the second quarter. So that's great. We're excited about that. But we need to make sure that you understand to stay focused on what we expect to do for the year. So we're not yet increasing our guidance for the year despite the fact that we're well underway to hit the guidance for the whole year. And we're confident that we're going to do that. We will evaluate opportunities that will come up in the next quarter and reassess whether we're going to increase our guidance for the year. And I'm optimistic that based on our performance to-date that we'll figure out a way to beat our guidance. But if we don't, it doesn't matter, because there are things, we've done this year to defer revenue into 2023. And we're well situated, we've got the largest backlog of available equipment that we've had in the history of the company, with basically a 10, 757 freighter conversions under contract to be converted next year and two, in 2024. So with that sizable amount of equipment, we've never had that much available equipment that we knew that we'd be able to take to market in the coming year. So we feel great about that. There were also two, 757, that we thought we would sell this year that we pulled from a transaction that we felt was undervalued, and we would get a greater return, not selling that aircraft as a whole aircraft not converted to -- didn't…

Operator

Operator

Thank you, sir. Ladies and gentlemen that concludes today's conference. Thank you for joining us. You may now disconnect your lines.