Thanks, Haytham. Good morning, everyone. Overall production in the third quarter was 173,000 ounces, a 22% increase from the prior year, primarily due to strong production at Salobo and Antamina, coupled with commencement of production at Blackwater. In Q3, Salobo produced 67,000 ounces of attributable gold, a 7% increase from the last year, driven by higher throughput grades and recovery. Vale reported that by the end of July, Salobo III had fully ramped up and the entire complex is now operating at full capacity, consistently delivering strong operational performance. Vale continues to advance a series of growth-focused initiatives to enhance efficiencies and support long- and medium-term production growth across the Salobo complex. Constancia produced 19,500 ounces of attributable GEOs in Q3, a 9% improvement from last year, primarily driven by 19% higher gold production resulting from higher grades, partially offset by an 11% decline in silver output due to lower throughput. On September 23, 2025, Hudbay Minerals commented on the ongoing social unrest in Peru, where Constancia was impacted by local protests and illegal blockades. The mill was temporarily shut down as safety precaution, while authorities addressed the situation. On October 7, 2025, Hudbay announced that operations had resumed and throughput has since returned to normal levels. Penasquito produced 2.1 million ounces of attributable silver in Q3, up 17% from last year, primarily driven by higher throughput and partially offset by lower grades as mining transitioned back into the Penasco pit, which contains lower silver grades relative to Chile Colorado. In the third quarter, Blackwater produced 6,400 ounces of attributable GEOs supported by higher-than-expected throughput and grades. Production for the year is expected to be weighted to the fourth quarter with higher mill throughput rates and feed grades expected compared to Q3 2025. Artemis has also announced a 33% increase to Phase 1 processing plant capacity, raising the nameplate from 6 million tonnes per annum to 8 million tonnes per annum with a targeted completion date by the end of 2026. In addition, Artemis is nearing completion of front-end engineering and design work for an optimized and accelerated Phase 2 expansion with an investment decision expected before year-end. In Q3, Almina restarted production of the zinc and lead concentrates at the Aljustrel mine, resulting in the resumption of attributable silver production to the company. During the quarter, Goose transitioned from commissioning to commercial production, which was announced on October 6. As reported by B2Gold, open pit and underground mining rates at the Umwelt deposit have continued to meet or exceed expectations during the 30-day commercial production period. B2Gold has also reported that gold recoveries have been in line with expectations and are expected to average higher than 90% through Q4 of 2025. Wheaton's production outlook for 2025 remains unchanged with -- and we continue to believe that we are well on track to achieve our annual production guidance of 600,000 to 670,000 GEOs. At Salobo, attributable production is expected to remain steady through the remainder of the year, supported by solid mining rates and consistent plant performance through Salobo I, II and III. At Penasquito, attributable production is forecast to be in line with budget and slightly down from Q3 due to steady mill performance and planned mine sequencing within the Penasco pit. At Antamina, attributable production is anticipated to strengthen in Q4 as the mine continues processing a higher portion of copper zinc ore. As mentioned by Randy, we remain confident that our catalyst-rich year is progressing as expected, with initial contributions from Mineral Park, Platreef and Hemlo still forecast by the end of 2025. That concludes the operations overview. And with that, I will turn the call over to Vincent.