Earnings Labs

Pan American Silver Corp. (PAAS)

Q3 2013 Earnings Call· Wed, Oct 30, 2013

$52.22

-5.45%

Key Takeaways · AI generated
AI summary not yet generated for this transcript. Generation in progress for older transcripts; check back soon, or browse the full transcript below.

Same-Day

-2.57%

1 Week

-2.75%

1 Month

-6.79%

vs S&P

-9.19%

Transcript

Operator

Operator

Good morning ladies and gentlemen. Thank you for standing by. Welcome to Yamana Gold 2013 Third Quarter Release Conference Call and webcast. At this time, all participants are in a listen-only mode. Following the presentation, we will conduct a question-and-answer session. Instructions will be provided at that time. I will now turn the call over to Ms. Lisa Doddridge, Vice President, Corporate Communications and Investor Relations.

Lisa Doddridge

Management

Good morning and thank you all for joining us. Before I turn the call over, I need to advise that certain statements made during this call today may contain certain forward-looking information and actual results could differ from the conclusions or projections in that forward-looking information, which include, but are not limited to, statements with respect to the estimation of mineral reserves and resources, the timing and amount of estimated future production, cost of production, capital expenditures, future metal prices and the cost and timing of the development of new projects. For a complete discussion of the risks, uncertainties and factors which may lead to our actual financial results and performance being different from the estimates contained in our forward-looking statements, please refer to our press release issued yesterday announcing our third quarter 2013 results, as well as our management’s discussion and analysis for the same period and other regulatory filings in Canada and the United States. Throughout the presentation, when speakers use the term ounces, they will be referring to gold equivalent ounces unless otherwise stated. Gold equivalent ounces include silver production at a ratio of 50:1. I would like to remind everyone that this conference call is being recorded and will be available for replay today at 2 pm Eastern Time. Replay information and the presentation slides accompanying this conference call and webcast are available on Yamana’s website at yamana.com. I will now turn the call over to Mr. Peter Marrone, Chairman and CEO.

Peter Marrone

Management

Lisa, thank you. Good morning and thank you to all of you for joining us this morning. As usual I have members of our senior management team here today to participate in our discussion of our third quarter results and of course our outlook going forward. Delays in travel from South American, our South American locations have kept our Chief Operations Officer from joining us. However, we are pleased to have our next level of operational management here with us to speak for our operations. Ladies and gentlemen, clearly 2013 to date has been a volatile year for commodity prices. As the volatility has dictated that companies in our industries should reduce spending costs, production levels to secure better future growth. That is our approach not because of a concern on costs but because we see this as a way to mitigate risk and we see it as an opportunity, an opportunity to do better. Preservation of margins and the generation of cash flow and free cash flow is that our philosophical core, we’ve been consistent with that for sometime. And this is an important point. In an environment where gold prices are rising or there is a reasonable certainty that it will continue to rise, where there is minimal risk of margin compression. Margin allowances should be produced. It will contribute to the generation of cash flow. The overall objective in a certain and rising gold price environment is to maintain an increased cash flows and to maximize production. In an environment where there has been volatility in gold price and the lack of clarity on the direction of that gold price, there is a higher risk of margins being eroded and the objective in this kind of environment at least in our view is to contain costs and…

Gerardo Fernandez

Management

Thank you, Peter. Production in the third quarter increased by 4% from the second quarter, which are near 307,000 gold equivalent ounces, continuing the trend of quarter-to-quarter growth. Our portfolio of core assets continue to provide a stable base of production with additional ounces coming in as our new operators' ramp up. We expect a much bigger jump in production in the fourth quarter as our newer mines continue to ramp up and expansion of Gualcamayo QDD Lower West comes online. Our operators in Chile and Mexico continue to deliver all key operations, increased production compared to the third quarter of 2012. El Peñón exceeded expectations in the quarter and year-to-date where production is up 10% from 2012 levels. Minera Florida delivered production at lower costs compared to the third quarter last year and at Minera Florida costs are down by 17% compared to the second quarter of 2013. We expect this core operations to continue delivering on expectations in the fourth quarter with Minera Florida showing the most improvement with higher production and lower costs. Gualcamayo in the quarter when as expected with production mainly source from stockpile material. Also we have transitioned to a new phase [indiscernible] called Phase III. As the transition to Phase III was competed in Q3, we’re expecting a significant increase in production in the fourth quarter. As underground development at QDD Lower West is complete, we’re expecting that it will begin contributing to production in the late fourth quarter. Production for Q4 will be a multiple of Q3 and costs would equally decline. In the third quarter, we received a $8.8 million dividend from Alumbrera with attributive production of near 9600 ounces. At Cerro Moro, we’ll continue from the production where it declined as the stability studies is still expected in 2014. Chapada…

Evandro Cintra

Management

Thank you, Gerardo. We worked continually with our three new operations that are our overall information [indiscernible] ramping reaching the ramp up to full operations. We began operations later in the year declared although the ramp up is progressing now. We expect to complete transitioning by the end of the year. But Ernesto/Pau-a-Pique ability on new plans which continues to include an underground operation at Pau-a-Pique, but we are now contemplating a near-to-surface underground operation at Ernesto. Under this new plan, production levels will be lower than originally planned, but there will be a greater reliability of production and at reduced costs. In the quarter, transitioning continue to go down underground Pau-a-Pique although with less ore from open-pit in Ernesto as the near surface underground at Ernesto is currently being developed. To conclude, I will turn it back to Gerardo.

Gerardo Fernandez

Management

Thank you, Evandro. With the third quarter arguably delivering our expectations, we’re well positioned to deliver productive growth in the fourth quarter and into 2014. This increased production and cash flow levels will be the result of our significant success, containing costs and a continuous daily production from our corporation with a regional production coming in from the new mines and expansions with full production level. Chuck will now review our financial performance.

Charles B. Main

Management

Thank you, Gerardo. Revenues grew from second quarter to $457 million, taking year-to-date revenues to over $1.4 billion. We had adjusted earnings of $70 million, or $0.09 per share taking year-to-date adjusted earnings to over $236 million, or $0.31 per share. Operating cash flow before changes in non-cash working capital was over a $177 million, or $0.24 per share. Year-to-date, we have generated $542 million or $0.72 per share of operating cash flow before changes in non-cash working capital. It is worth noting, we have delivered these results in a quarter where commodity prices were lower than the same quarter last year and has continued decline from the second quarter of this year. In the quarter, we maintained our strong balance sheet as cost stabilized at lower levels. Cash and available credit at the end of the quarter were approximately $1 billion. This cash equivalents of approximately $232 million. Depletion, depreciation and amortization was $99 million for the quarter. Corporate G&A declined by 20% from last quarter and in the prior year. It was $30 million for the quarter. Exploration expense was $7 million, which was 53% lower than the third quarter of 2012. And total capital spend in the quarter was $218 million, which has been lowered by the expenditure reduction program reflecting impact the results of our cost containment initiative. The relative strength of our balance sheet was maintained in this quarter as we transitioned to this new price environment. I would like to turn to cost and provide an update on the previously announced cost containment initiatives. The program is progressing on course. In the quarter, we’re able to reduce our all-in sustaining co-product cash costs by $62 per GEO from the second quarter, bringing total reductions from the first quarter to a $126 per GEO or…

Darcy Marud

Management

Thanks Chuck. As a reminder our principal goal for exploration is and always has been to add value to our existing operations through the discovery and delineation of new resources. The strategy of exploring in the shadow of frame is valid today as it has ever been and the exploration success is previous year’s and this year will be and have always been a key in helping them on achieve its longer term production goals of $1.7 million gold equivalent ounces. We continually evaluate our exploration programs to ensure that we are funding our most encouraging project so that we can move resources through reserves as quickly and as efficiently as possible. In the case of our operating assets, we evaluate each to ensure that we have a minimum of seven years life of mine in mineral reserves and longer in reserves and resources. As part of our cost containment efforts, we forecast the decrease in exploration spending for 2014 but we believe that this will not affect our success in finding new resources that we have seen inputs and exploration coming down during 2013. We also don’t expect this to affect our principal assets as a seven year mine life has been confirmed for most operations. To highlight some of this year’s exploration achievements that will lead to increased resources and reserves I would like to pass the call to Mr. William Wulftange, Vice President of Resources and Reserves.

William Wulftange

Management

Thank you, Darcy. This morning, I would like to briefly touch on select exploration success stories that continue to unfold the five important Yamana assets, first at Chapada. During the quarter, we completed 7,423 metres distributed in 74 holes, finishing the infill program at Corpo Sul and testing the near mine exploration targets as well as completing some local condemnation drilling. As the results from the Corpo Sul infill program continue to return broad intercepts of above life-of-mine average grades and are expected to increase the mineral resource numbers as well as have a positive impact on reserves. At El Peñón, exploration activity is full stream ahead and El Peñón completing over 40,000 metres distributed in a 128 holes during the quarter. Three new exploration discoveries were made during this quarter in the hanging wall blocks of Providencia and Aleste structures and identifying a completely new vein system at Borde Oeste located east of Cerro Martillo complex the southeast of Bonanza. The new vein systems are high grade gold and silver structures 0.5 metres to nearly 2 metres and 2 width and the exploration team continues to drill and expand these new discoveries as well as define the resource potential. At Gualcamayo, the underground exploration program continues to return positive results, so much so that additional funding was allocated in early September, so that the exploration can continue to test the needs for the Rodado and QDD Lower West systems. At Minera Florida, exploration is focused on Lisset Vein within the Mina Este target complex and the Tribuna-Victoria system 800 metres to the east. Both programs have identified new minable thicknesses of above average grades that will continue to contribute to Yamana’s goal of resource growth and reserve replacement. At Cerro Moro exploration efforts focused on testing the newly discovered Margarita vein system along with extending the known Carlita and Patricia veins along strike and down depth. All three programs have accomplished these goals and the exploration team has now turned to resource and reserve estimation as well as new target generation. In closing I believe the exploration team has designed programs that demonstrate focus, commitment and the ability to reach and achieve the perennial goals of resource growth and reserve replacement. I will now turn it back to Peter.

Peter Marrone

Management

Thank you, Butch. So this is the balance. Ladies and gentlemen, contain costs; spend wisely, increase production in that increasing cash flow. Where there is a risk, the import certainty generates sustainable cash flow, contain costs because production growth which follows will be more reliable better able to contribute significantly the cash flows. Someone recently said to me something that you probably know. The comment was they don’t build statues to cost cutters. The cost cutters don’t get metals. There are no monuments to them. Success comes from growth and we know that. So this is not about cost-cutting only, it is about certainty and sustainability leading to further growth of production which begins this quarter in Q4 in the sustainable cash flows and more certainty, that if we spend money on increasing production, we can make money also in almost any metal price situation and at the best levels possible. So with that ladies and gentlemen, I will open the call for questions.

Operator

Operator

Thank you. We will now take questions from telephone lines. (Operator Instructions) The first question is from Anita Soni from Credit Suisse. Please go ahead. Anita Soni – Credit Suisse: Sure, I have a couple of questions. First of on Suruca, what’s...

Peter Marrone

Management

I’m sorry Anita; we can barely hear you, my apologies. Anita Soni – Credit Suisse: Sorry, I will on the – on Suruca the reserves and resources how much was in the gold mineral in the 2012 year end mineral statement in Suruca and at what grade?

Peter Marrone

Management

It’s only the offside that are in reserves and it’s about 0.5 grams per ton. Anita Soni – Credit Suisse: Okay.

Peter Marrone

Management

That we’re carrying as proven and probable reserves in the Chapada estimates for gold production and my recollection is we have about 400,000 ounces in proven and probable reserves. Anita Soni – Credit Suisse: Okay.

Peter Marrone

Management

Sorry, slightly less than that it’s 300,000 ounces, Anita. Anita Soni – Credit Suisse: Sure, and what’s the status of Suruca right now?

Peter Marrone

Management

It is interesting. Part of what you’re seeing in our, I’m sure what you’re seeing in our MD&A is we’ve indicated for Chapada, our plan is 130,000 ounces and £130 million of copper, that is well in excess of the production that we would expect to get beginning in 2015. Most of that contribution and perhaps indeed all of that contribution will come from the Chapada pit and Corpo Sul. With as Butch mentioned, the successes that we’re getting at Corpo Sul, we’re evaluating whether or not the better more sustainable production level initially is 130,000 ounces rather than 150,000 ounces, the difference would come from Suruca, but if we add Suruca’s 40,000 ounces then we would be well in excess of 150,000 ounces. So part of what we’re evaluating is should we be spending the money for Suruca in 2014 or wait a little bit longer and spend the money on Corpo Sul, which will give us while a smaller production level on the gold side of Chapada, we will also get better cost, than we would have been garnering in the overall production platform of 150,000 ounces. That is what we are evaluating, should we spend the capital in 2014 or wait on Suruca into 2015. There is a further issue Chapada is becoming increasingly larger with Corpo Sul, the in-pit pressure, the [indiscernible] Suruca. We now have some power constraints and so part of what we’re evaluating is what’s the optimal way to deliver the required amount of power for the much larger operation beginning in 2015 and should we do it over more strategic period of time. Suruca was regionally planned to start in late 2014. We are continuing to evaluate whether or not that is an optimal program for Chapada because of the successes at Corpo Sul, what we’re currently evaluating is that we would emphasize Corpo Sul and Chapada in 2015 and the years to follow, the effect of which would be that our production target then and our production platform will be 130,000 ounces and a 130 million tonne of copper rather than the 150,000 ounces but at much better costs. Anita Soni – Credit Suisse: All right, so can I just finish the question with, one, what’s the capital that would have been expected for Suruca, and two, on Corpo Sul, what is the amount within the reserves statements for that deposit?

Peter Marrone

Management

Anita I heard the first question the capital on Suruca and we estimated that – what was the second question? Anita Soni – Credit Suisse: The second question was with respect to the amount of the reserves that are related to Corpo Sul.

Peter Marrone

Management

Well, let me address the first question and then I’ll pass it to Butch on Corpo Sul. On Suruca, we’re estimating that the CapEx is in the range of $70 million with Suruca. And on the question which I know it’s difficult to hear, but the question was what do we have as reserves coming from Corpo Sul?

William Wulftange

Management

Well right now we have on the reserve statement nearly 900,000 ounces of gold and 795 million pounds of copper. So that’s the current reserve.

Peter Marrone

Management

And that’s as of the end of 2012 and we are expecting this year because of the in-fill that Butch touched on briefly. We’re seeing a great increase for copper and gold. We’re seeing an increase in total pounds of copper and ounces of gold. So we should anticipate that at the end of year, this year we’ll have an increase to those numbers and we’ll also likely have an increase to the grade as well. Anita Soni – Credit Suisse: All right, thank you. And just one more question if I may, can you break out the $73 million sustaining capital that you spent this quarter by asset?

Charles B. Main

Management

What we spent in expansionary capital? Anita Soni – Credit Suisse: No sustaining that growth…

Charles B. Main

Management

: Anita Soni – Credit Suisse: Okay, thank you very much. That’s it for me. Thanks.

Operator

Operator

Thank you. Your next question is from Dan Rollins from RBC Capital markets. Please go ahead.

Dan Rollins

Analyst

Yes, thanks very much. Peter team, you guys have done a very good job, but really raining in the cost and all-in sustaining basis. Specifically if you exclude the stock based comp, you’re looking around $24 million of G&A down from around probably run rate of closer to 35 to 40. Is the 23 million ounces, 25 million ounces achievable run rate going forward or do you still see room to make some cost cuts on the corporate side?

RBC Capital Markets

Analyst

Yes, thanks very much. Peter team, you guys have done a very good job, but really raining in the cost and all-in sustaining basis. Specifically if you exclude the stock based comp, you’re looking around $24 million of G&A down from around probably run rate of closer to 35 to 40. Is the 23 million ounces, 25 million ounces achievable run rate going forward or do you still see room to make some cost cuts on the corporate side?

Peter Marrone

Management

Sorry the $23 million, $24 million in G&A?

Dan Rollins

Analyst

Yes.

RBC Capital Markets

Analyst

Yes.

Peter Marrone

Management

Yes, we’re developing an increasing confidence that we’ve changed the G&A down to a sustainable level. We’ll see if we can get some further improvements. There is a modest additional improvement that we’re planning as part of our budgeting process in 2014, but that’s under the evaluation phase. I think a good number Dan is in the range of, on an annual basis it’s in the range of $125 million to $130 million.

Dan Rollins

Analyst

Okay perfect. And then just on your sustaining capital, in the past you’ve mentioned between $350 million, $400 million annually once all your mines are up and running for sustaining capital. Is that still a good estimate to use? Or have you been able to find some additional cost savings on sustaining capital at your existing operation?

RBC Capital Markets

Analyst

Okay perfect. And then just on your sustaining capital, in the past you’ve mentioned between $350 million, $400 million annually once all your mines are up and running for sustaining capital. Is that still a good estimate to use? Or have you been able to find some additional cost savings on sustaining capital at your existing operation?

Peter Marrone

Management

Again a good question and again it’s important to make sure that we don’t double count it because as you are aware we include this into our all-in cost structure, on a per ounce basis. On an aggregate basis, it does increases as revenue operations. We’re anticipating somewhere in the range of $380 million to $400 million next year, which would mean that it would remain relatively flat to slightly down, but with more operations. So on a per ounce basis, it should come down also. As you are aware in the number $925 per ounce or $850 per ounce after credit, after copper as a credit that we published earlier this year, for 2014, we’re including the sustaining CapEx on a per ounce basis. But if you look at our third quarter results, we delivered every ounce of gold not at $925 per ounce, but at $880 per ounce. And on a by-product basis, we delivered every ounce not at $850 per ounce but $750 per ounce. So does that mean that a sustainable for now. We stand by our forecast and our guidance on cost for 2014 is $925 million and $850 million but we think that there remain some room for improvement, some of that will come from sustaining capital.

Dan Rollins

Analyst

Okay, and then just on growth capital is a good estimate for next year roughly about $250 million or is that a little late?

RBC Capital Markets

Analyst

Okay, and then just on growth capital is a good estimate for next year roughly about $250 million or is that a little late?

Peter Marrone

Management

Well, as Chuck alluded and we’re going through the budgeting process now as Chuck suggested, we dropped a little bit whether or not we should give some indications of our CapEx, our expansionary capital next year but we’re in the budgeting process, we publicly said previously that $250 million was the number for 2014 but we’re evaluating now is a possibility of reducing that, to a number that is below $200 million. So I would say that a good estimate is between $200 million and $250 million today we might be able to come in with a number that is lower than that but we’re evaluating that and it goes to the question that was previously asked by Anita about what are we doing with Suruca, if we’re spending on Suruca then we’re likely coming closer to that $200 million to $250 million and if we’re not then and we have a better plan accentuating Corpo Sul and then deferring Suruca then we would be spending at a number that is likely at or below $200 million. But we’re going through that evaluation process now.

Dan Rollins

Analyst

Okay, and then just on Gualcamayo for Q4 you mentioned it would be a multiple of Q3 if I presuming given the fact that you have new pads starting up also the benefits from the higher grades from QDD Lower West that you’re going to get a build the pole lot of ounces over the pad in Q4 and then you’ll see more of a steady run rate as we move into 2014?

RBC Capital Markets

Analyst

Okay, and then just on Gualcamayo for Q4 you mentioned it would be a multiple of Q3 if I presuming given the fact that you have new pads starting up also the benefits from the higher grades from QDD Lower West that you’re going to get a build the pole lot of ounces over the pad in Q4 and then you’ll see more of a steady run rate as we move into 2014?

Unidentified Company Representative

Analyst

Yeah, that’s correct and what we’re seeing is three things really the new pad it’s [Indiscernible] and the open-pit from Phase III and then it is the start-up of production coming from the near-to-surface underground of QDD Lower West and that should deliver that multiple of production we produced roughly 27,000 ounces in Q3 and we’ll get a multiple of that in Q4.

Dan Rollins

Analyst

Okay, perfect and just there one last question just on E&P the new underground I guess the shallow underground you’re looking at doing under the open-pit or to take out the open-pit how much additional capital is going to be incurred and how this is going to change the cash flow – cost structure because I think a lot of times you talked about E&P you mentioned cash costs probably in the potentially in that $1000 an ounce range. Where do you think you can get to on sustainable basis as the E&P go forward?

RBC Capital Markets

Analyst

Okay, perfect and just there one last question just on E&P the new underground I guess the shallow underground you’re looking at doing under the open-pit or to take out the open-pit how much additional capital is going to be incurred and how this is going to change the cash flow – cost structure because I think a lot of times you talked about E&P you mentioned cash costs probably in the potentially in that $1000 an ounce range. Where do you think you can get to on sustainable basis as the E&P go forward?

Unidentified Company Representative

Analyst

What we’re trying to get to is a production platform of about 60,000 ounces roughly half of which would come from that very, very near-to-surface underground at Ernesto and some of it would come from a new satellite deposit called [indiscernible] and the majority would come from the already developed power, the cost structure we’re going through that evaluation process but we’re aiming toward is an all in cost of below $1100 per ounce, we won’t see that in the first quarter of the year, we do anticipate seeing that by the end of the year. The amount of capital required to do that is modest. We’re talking about millions of dollars, not the tens of millions of dollars and we should be able to get to that by the second quarter of next year. It is very near to surface. So the good news about Ernesto/Pau-a-Pique is that it is the plan is now better plan to be able to deliver a lesser number of ounces, but at a greater certainty on cost structure. What we experienced in the open-pit is a variability and a swing in ore grade that was a very erratic and unclear, so very significant possible or negative effect. This gives us a better plan. It allows us to get more certainty of production, roughly 60,000 ounces as I mentioned, a modest amount of capitals are spend to get there. We wait and see the cost structure improving to that 1,100 in the first quarter, possibly the second quarter of the year. We are expecting it current cash flow positive in the second half of the year and we’re expecting it to be entirely cash flow positive in 2015.

Dan Rollins

Analyst

Great. Thanks very much.

RBC Capital Markets

Analyst

Great. Thanks very much.

Operator

Operator

Thank you. The next question is from James Bender from Scotiabank. Please go ahead. James Bender – Scotiabank: :

Peter Marrone

Management

Let me deal with at the first couple of points, I’ll pass it to Gerardo on QDD Lower West also, and then perhaps to Chuck on the capital expenses. As I mentioned in answer to the previous question, the production at Gualcamayo is going to increase in Q4 for three reasons, some of which is QDD Lower West. The bigger portion of it is the Phase III in the open-pit as QDD Lower West ramps up. So that multiple to which I referred is a combination of three things. It is the new areas of Phase III in the open-pit. It is the QDD Lower West ore and it is also the fresh pads. James Bender – Scotiabank: Okay.

Peter Marrone

Management

Gerardo, do you have a breakdown of what it is by component, each of those components?

Gerardo Fernandez

Management

No, in ounces, but we expect to reach the stable for the 3,000 bucks for data, what Gualcamayo at the end of the quarter, and the main contribution would come from a million [indiscernible] and the new Phase III account.

Peter Marrone

Management

In terms of the 2013 new mines and let’s preference with the Pilar and C1 Santa Luz again where we just started the ramp up and if we look at the production platform in the third quarter, it is not representative of what we would expect in the fourth quarter, but we would represent expect for 2014. If we look at an estimate, I would anticipate that for C1 and Pilar, we should get somewhere in the range of 15,000 to 20,000 at the bottom end and 30,000 at the top end. And if it’s at the top end as I mentioned then we would be at a production level that is over that 1.3 million ounces that I referred to in the presentation. If we look at 2014, which is the first full-year of operations, we expect to be a commercial production at both of these operations late this year, early into 2014. There is a high probability of being in production well before we announce our year-end results in February, the result of which is that we should be expecting a production level for each of those two mines at somewhere over 90,000 ounces for that first year of operations and the more sustainable production level going forward is between 90,000 and 120,000 ounces, likely above a 100,000 per month. James Bender – Scotiabank: Okay and...

Peter Marrone

Management

Sorry, please go ahead. James Bender – Scotiabank: And for Ernesto is that Q4 expected to be all commercial?

Peter Marrone

Management

No, as I mentioned for Ernesto, we’re expecting that it would be commercial because what we’re now doing is we’re developing that near-to-surface underground at the Ernesto open-pit. James Bender – Scotiabank: Okay.

Peter Marrone

Management

So the result of that is we expect commercial production from Ernesto to occur in the second quarter of 2014. James Bender – Scotiabank: Okay, thank you very much. That’s it from me.

Peter Marrone

Management

And you’ve asked about CapEx? James Bender – Scotiabank: Oh, yes, the CapEx.

Charles B. Main

Management

Yeah, Q3 capital was $280 million of that approximately $50 million was construction. So that construction activities tapering down in the fourth quarter. So I guess a ballpark way to do it is there would be about $15 million less. So the Q4 capital would be expected to be around Q3 level minus $35 million, so say $180 million. James Bender – Scotiabank: Okay, thank you very much.

Operator

Operator

Thank you. The next question is from David Haughton from BMO Capital Markets. Please go ahead. David Haughton – BMO Capital Markets: :

Peter Marrone

Management

Yeah, C1 Santa Luz – I’m going to turn it to Evandro in a moment that C1 Santa Luz grades are reconciling well. As you know C1 Santa Luz is an open-pit. The challenges for each – for any particular operations are always different from operation to operation. Our challenge with C1 Santa Luz was ensuring that the recovery where at higher levels and that’s now ramping up. That’s not been a great issues. But Pilar’s and underground mine, it has been more of making sure that we can reconcile the grade and we are now beginning to get good reconciliation on the grade for Pilar.

Evandro Cintra

Management

Okay. Ernesto/Pau-a-Pique, the reconciliation for Pau-a-Pique underground is there would be ramp up in the third quarter was included very much. We are now, have started to develop this underground at Ernesto, which we expect will be similar reconciliation that we had in Northeast. For Pilar, we’re still having some extra dilution due to the size of our Caiamar. But the same that we have done in the grade control, we’re showing that the grade is according to the model is more a question of contain dilution that will be comparing with the new [indiscernible]. David Haughton – BMO Capital Markets: All right, thank you. And with the change of plan now at Ernesto/Pau-a-Pique, going now effectively for two undergrounds; how should we think about the throughputs that you would achieve from each of them as far as tonnes, mine and kind of grades you’re looking for? And then I guess the next question is how those costs put into play, which one would be carrying more cost et cetera?

Charles B. Main

Management

Okay, if you look at the plant there with a 3,000 tonnes a day that would be more or less copper, 1,500 tonnes from city, 1,500 tonnes from international underground. And that cost of structure that we expected for the mine sales would be in the ranges from $40 for the mine. David Haughton – BMO Capital Markets: Okay. So the cost structure for each are very similar than?

Charles B. Main

Management

Yes. David Haughton – BMO Capital Markets: And what are the grades that you would anticipate from one versus the other?

Charles B. Main

Management

Hope, we have a similar grades that will be from 3 grams to 4 grams. David Haughton – BMO Capital Markets: Okay. So they kind of look very similar to each other then?

Unidentified Company Representative

Analyst

Yes. As the reconciliation of [indiscernible] but in terms of our mine and gold factor has been over 100%. So we’re getting good reconciliation for the grade. You asked the question of Pilar, and I think it’s important to pick up on the points that have for me. We’re sizing the equipment that is to be used with that mine, it’s smaller equipment that was originally planned. The result of which is that we should mitigate dilution quite significantly. So we’re capturing rate where we expect to get rate. The ore body is where we anticipated to be, but it’s the size of equipment. : David Haughton – BMO Capital Markets: Okay. Now with these three new operations in commercial production, at least early next year, would you expect that to host the site visit down to see these three things next year?

Peter Marrone

Management

: David Haughton – BMO Capital Markets: That’s great. Thank you, Peter.

Peter Marrone

Management

Thank you.

Operator

Operator

Thank you. The next question is from Anita Soni from Credit Suisse. Please go ahead. Anita Soni – Credit Suisse: Hi, I just wanted to follow-up on the Ernesto/Pau-a-Pique. Is there an additional capital in terms of developing the underground positive in Ernesto now that we would expect for 2014?

Peter Marrone

Management

Yes, as I mentioned, we’re anticipating that that amount of capital was into millions of dollars and not the tens of millions of dollars. It will not cost a significant amount to do that development work. Anita Soni – Credit Suisse: Okay.

Peter Marrone

Management

So that was a question, which was previously asked and that’s what our current anticipation is. Anita Soni – Credit Suisse: Right.

Peter Marrone

Management

So we’re not talking about a large amount of money to get there. Anita Soni – Credit Suisse: Yes. Sorry, I missed that. Thanks.

Peter Marrone

Management

Thank you.

Operator

Operator

Thank you. The next question is from Doug Dyer from Heartland Advisors. Please go ahead.

Doug Dyer

Analyst

Yes. So you ended the quarter with approximately $230 million. Going forward into the next few quarters as we get closer to the end of the spending bulge, where do you anticipate cash bottoming out and in which quarter? – Heartland Advisors, Inc.: Yes. So you ended the quarter with approximately $230 million. Going forward into the next few quarters as we get closer to the end of the spending bulge, where do you anticipate cash bottoming out and in which quarter?

Peter Marrone

Management

Doug, our stated objective has always been to have a minimal amount of cash with at least $150 million in our treasury. And so we would anticipate that the bottom occurs in Q4 and we would have in the range of $150 million in cash in our treasury. And our expectation that is that will continue to build into 2014, as we generate the cash flows that we’ve described at the higher production levels with the cost structure that we’ve just indicated and given that our CapEx is a fraction of where it is this year, and likely coming down as well from the $250 million number that we previously published. Our exploration spend is no longer needs to be at the level that it was given the successes we’ve had over the last four or five years. We’re anticipating it will increase those cash balances in the 2014. It all depends on where metal prices would be, but if we assume a static metal price, we’ve assumed 1,300 for now. We would expect that level of cash at the end of the year and that increases in 2014.

Doug Dyer

Analyst

All right, that’s great to hear. Thank you very much. – Heartland Advisors, Inc.: All right, that’s great to hear. Thank you very much.

Operator

Operator

Thank you. (Operator Instructions) The next question is from Andrew Quail from Goldman Sachs. Please go ahead. Andrew Quail – Goldman Sachs & Co.: Hi guys, thank you very much for the update this morning. Most of my questions have been asked, but I do have one on into the reserve resources. You guys obviously use a much lower number than most. Are you guys sort of reviewing that given this sort of correction in process, or are you happy where you guys are?

Peter Marrone

Management

We’re happy using $950. I think that is a – still a reasonable number to use. As you know Andrew, reserves are the long-term plan of any operation. And so we think the $950 is still a very respectable, sustainable long-term number. Even in the context to where metal prices are, and in the context of where some are projecting metal prices to be. It’s not below or nowhere near $950. So we feel that’s the reasonable number and there is a further point, which is when we’re comparing reserve growth year-over-year it makes for an easier comparison. It makes it easier for shareholders in this company and people who follow the company such as yourself, be able to say it’s not because of metal prices there has been an increase or whatever, it’s because they’ve actually been successful of finding new ones. Andrew Quail – Goldman Sachs & Co.: I appreciate the conservatism and one last thing on Gualcamayo, what obviously grade increasing and tonnage as well, I mean obviously costs are going to come down. Do you think or can you give some sort of guidance of how much they could come down in Q4 or enabling to sort of 2014. That back to sort of levels of 2012 or what do you guys sort of forecast?

Peter Marrone

Management

Yes, all-in costs for Q3 at Gualcamayo were in the range of $1200 per ounce. Andrew Quail – Goldman Sachs & Co.: Yes.

Peter Marrone

Management

A lot of that also was some earth moving exercises, waste removal to get the Phase III that we observed into the third quarter. We’ll see a significant improvement in Q4. So again it’s always difficult to predict on a quarter-by-quarter basis. But the cost structure at Gualcamayo even in the inflationary environment of Argentina should be below $900 per ounce, all-in. Andrew Quail – Goldman Sachs & Co.: Got it.

Peter Marrone

Management

So we’re still confident that beginning in Q4, we’ll begin to recognize that improvement to costs. Andrew Quail – Goldman Sachs & Co.: Got it. Thanks Peter.

Peter Marrone

Management

Thank you, Andrew.

Operator

Operator

Thank you. The next question is from Alec Kodatsky from CIBC. Please go ahead. Alec Kodatsky – CIBC World Markets: Thanks. Just a couple of quick follow-ups just with Ernesto; just trying to get just a bit of clarity, with respect to the open-pit, is the intention to repurpose the equipment or are you going to continue to hold on and access other satellite deposits as they make them available?

Peter Marrone

Management

And again the exploration successes here it’s a very good question, Alec. The exploration success is to demonstrate that there are some satellite open-pit deposits. And so I alluded to one earlier that Lavrinha deposits, so some of the production in 2014 will come from Lavrinha and that is a very near to surface open-pit, very shallow open-pit. So we do expect that we’ll be able to get the benefit of some open-pit material come through that plant in 2014. Alec Kodatsky – CIBC World Markets: Okay. And then to completely change gears, because we haven’t talked about it. Maybe just a couple minutes or even less than that if you wish on Cerro Moro, so you’re thinking I guess more in the context of the political environment in Argentina and the progress that you’re looking to make there just general thoughts around that and whether you’re thinking has changed a lot in the last quarter?

Peter Marrone

Management

Well, Alec, it’s interesting. I’m really happy that you presented it in the way that you have starting with EPAP and then ending up with Cerro Moro, because I think as you can appreciate Ernesto/Pau-a-Pique is now our smallest mine and with roughly 60,000 ounces of production and even ended $1,100 cash cost. Ernesto/Pau-a-Pique squarely gets into the category of absolutely non-core to this company, recognizing the importance of making sure that we’ve got it right, we’re doing that. That’s just a philosophy of this company to make sure that we don’t abandon something just because it’s small, but equally it is a very small part of this portfolio. Coming to Cerro Moro, that’s the opposite end of the spectrum. Cerro Moro is the absolute future of this Company. Cerro Moro is a high-grade deposit, 15 grams per tonne. We expect it to have significant increases in resources, beginning this year. We expect to have with a feasibility study pending proven and probable reserves that demonstrates the viability – and the feasibility study that demonstrates the viability of this operation of more than 200,000 ounces per year and a cost structure that is below $450 per ounce. Cerro Moro is definitely on the path of development because it delivers some substantial growth of this Company. And as you may recollect, when we bought it, we anticipated that with a very small percentage of our market capitalization as the time, it was about 2% of our market cap, this asset will generate cash flow that should be in the range of $0.20 per share, a 20% increase in cash flow per share. So it’s pretty significant. So Cerro Moro is definitely on the slate of development. But the question is what should we do to make sure that we do it…

Peter Marrone

Management

Well, yes to both, yes to both. Alec Kodatsky – CIBC World Markets: Okay.

Peter Marrone

Management

Because one of the things that is important is to evaluate what is the impact. I mean we said earlier this year that if we take the CapEx that was assumed by the company that we bought last year, there was a feasibility level and then we layered that with our experience at Mercedes because after all this is a plant and mine that is very similar to Mercedes, but at 2.5 tonnes of the grade. And so if we look at the experience there, if we look at our experience with Gualcamayo’s expansion and what we’re spending on that and if we look at the experience that we have at Mercedes, at El Peñón, which are very similar ore bodies and very similar mining method and processing method to Cerro Moro. We over layered their cost structure, put on top of that the inflationary impact in Argentina and put on top of that what was the exchange rate of 5.5 Pesos to the dollar at the time and we came up with a CapEx of approximately $400 million by comparison to the published number of that that company about $180 million. So is there room for improvement between $180 million and $400 million, absolutely. So a part of it will be evaluating between now and the middle of next year and interestingly to the end of 2014 as we start the process of development is how can we save on that $400 million CapEx. Why I say yes and no to you is because this project still delivers a very robust returns, even if we spent $400 million with all of those over layering that we put into that $400 million number. But we think we might be able to do it at a better CapEx with a better cost structure that will evolve over the course of 2014. Alec Kodatsky – CIBC World Markets: Okay, thank you very much. I appreciate the answer.

Peter Marrone

Management

Thank you, Alec.

Operator

Operator

Thank you. There are no further questions registered at this time. I would like to turn the meeting back over to Mr. Peter Marrone.

Peter Marrone

Management

Thank you very much. And ladies and gentlemen, thank you very much for participating on this call today. We look forward to and perhaps you can hear our confidence in the fourth quarter of this year. We look forward to meeting with you again in relation to our fourth quarter results and delivering on some of the things that we’ve indicated today that we will do on some of the operations and more holistically globally in terms of the overall production increases in this company beginning in Q4. We will continue with an economic thesis with a commercial thesis of container costs as part of a program of making sure that you’re delivering on production, so that we can preserve margins. Some of the participants on this call who have asked questions, the gold price assumptions that are higher and some lower. The way that we look at this is we have to be sustainable in the lower cost environment and the rest of it is upside and that’s what we’re endeavoring to do. So with that thank you very much ladies and gentlemen.

Operator

Operator

Thank you. The conference has now ended. Please disconnect your lines at this time. We thank you for your participation.