Earnings Labs

Ormat Technologies, Inc. (ORA)

Q4 2024 Earnings Call· Thu, Feb 27, 2025

$111.72

-1.04%

Key Takeaways · AI generated
AI summary not yet generated for this transcript. Generation in progress for older transcripts; check back soon, or browse the full transcript below.

Same-Day

+1.31%

1 Week

+0.64%

1 Month

+2.65%

vs S&P

+7.04%

Transcript

Operator

Operator

Good morning, and welcome to the Ormat Technologies Fourth Quarter and Full Year 2024 Earnings Conference Call. All participants will be in a listen-only mode. After today's presentation, there will be an opportunity to ask questions. [Operator Instructions] Please note that this event is being recorded. I would now like to turn the conference over to Josh Carroll with Alpha IR. Please go ahead.

Josh Carroll

Analyst

Thank you, operator. Hosting the call today are Doron Blachar, Chief Executive Officer; Assi Ginzburg, Chief Financial Officer and Smadar Lavi, Vice President of Investor Relations and ESG Planning and Reporting. Before beginning, we'd like to remind you that, the information provided during this call may contain forward-looking statements relating to current expectations, estimates, forecasts and projections about future events that are forward looking as defined in the Private Securities Litigation Reform Act of 1995. These forward-looking statements generally relate to the company's plans, objectives and expectations for future operations and are based on management's current estimates and projections, future results or trends. Actual future results may differ materially from those projected, as a result of certain risks and uncertainties. For a discussion of such risks and uncertainties, please see risk factors as described in Ormat Technologies' Annual Report on Form 10-K and Co-Reports on Form 10-Q that are filed with the SEC. In addition, during the call, the company will present non-GAAP financial measures such as adjusted EBITDA. Reconciliations to the most directly comparable GAAP measures and management reasons the press release that was issued last night as well as in the slides posted on the website. Because these measures are not calculated in accordance with GAAP, they should not be considered in isolation from the financial statements prepared in accordance with GAAP. Before I turn the call over to management, I would like to remind everyone that a slide presentation accompanying this call may be accessed on the company's website at ormat.com via the presentation link that is found on the Investor Relations tab. With all that said, I would now like to turn the call over to Ormat's CEO, Doron Blachar. Doron?

Doron Blachar

Analyst · Oppenheimer. Your line is open

Thank you, Josh, and good morning, everyone. Thank you for joining us today. 2024 was another successful year for Ormat as we delivered solid operational and financial performance and made market advancements executing against the key pillars of our multi-year growth strategy. This success was highlighted by top-line improvement of 6.1% and an adjusted EBITDA improvement of 14.3%, with solid growth demonstrated across all three of our business segments. As you can see on Slide 4, in the Electricity segment, we celebrated the successful acquisition of Enel assets, a strategic move that has substantially boosted our revenues and EBITDA. This acquisition coupled with a remarkable recovery and resource stability at Puna and Olkaria enabled us to more than offset the operational events and curtailments to deliver strong financial results and impressive adjusted EBITDA growth. In addition, we secured three new PPAs for our Boyan power plant in Guadeloupe, as well as Hebe 1 and Mammoth 2 in California, which captured significantly higher rates than our current agreements, demonstrating the strong demand we are experiencing in The U.S. and globally for geothermal. Turning to the Storage segment, we brought three new facilities online including the 80 megawatts, 320 megawatts hour Bozident project, the largest storage facility in our portfolio. This milestone along with the signing of two tolling agreements in Texas and one resource adequacy agreement in California has transitioned this segment towards lower overall volatility and more consistent profitability, while growing its way within our overall portfolio. In the Product segment, we have fully recovered our top-line, improved our segment profitability and reached an all-time high backlog with the support of the approximately $210 million contract in New Zealand. This achievement combined with our successful efforts in raising over $500 million in corporate and finance debt and the receipt of significant tax benefits highlights our strategic financial management and robust market presence. These accomplishments are a testament to our unwavering dedication to growth. They position us for continued success and reinforce our commitment to delivering value to our stakeholders. Now before I provide further updates on our operations and plans, I will turn the call over to Assi to review the financial results for the quarter. Assi?

Assi Ginzburg

Analyst · Oppenheimer. Your line is open

Thank you, Doron. Let me start my review of our financial highlights on Slide 6. Total revenues for 2024 were $879.7 million marking growth of 6.1% year over year and revenue for the fourth quarter was $230.7 million down 4.4% year-over-year. The improved top line performance on a full year basis was driven by growth across all three of our business segments with the magnitude of year over year revenue growth driven largely by the strategic expansion on our electricity portfolio. Ormat gross profit for 2024 was $272.6 million, a 3.3% increase compared to 2023. Gross profit in the fourth quarter declined 6.2%, primarily due to the unexpected impact we saw in Electricity segment due to curtailments. In the fourth quarter of 2024, net income attributable to the company's stockholders was $40.8 million or $0.67 per diluted share marking solid growth in comparison to $35.7 million or $0.59 per diluted share in the same quarter last year. On an adjusted basis, net income attributable to the company's stockholders was $43.6 million or $0.72 per diluted share, an increase of 7.7% and 7.5% respectively. In the full year 2024, net income attributable to the company's stockholders was $123.7 million or $2.04 per diluted share in comparison to $124.4 million or $2.08 per diluted share last year. On an adjusted basis, net income attributable to the company's stockholders for the full year 2024 was $133.7 million or $2.2 per diluted share, an increase of 9.7% and 7.3% versus last year respectively. Full year adjusted EBITDA was $550.5 million marking an impressive increase of 14.3% compared to 2023. Our fourth quarter adjusted EBITDA results were $145.5 million, an increase of 4.6% compared to the fourth quarter of last year. This year-over-year growth in adjusted EBITDA was driven by the contribution of new projects…

Doron Blachar

Analyst · Oppenheimer. Your line is open

Thank you, Assi. Turning to Slide 14 for a look at our Electricity segment operating portfolio. Since the beginning of 2024, we successfully added 133 megawatts of new net capacity organically, as well as through strategic accretive M&A. Generation increased 3.5% and excluding curtailment, our generation grew by 10%. This growth was driven by our acquired assets, improved performance at Puna, a full year of operations at Heber 1 at higher capacity, the repower of [Biowi] and the increase in our carrier capacity to nearly 150 megawatts in the latter half of 2024. Earlier this month, we announced the successful COD for the Ijen Geothermal power plant, which we jointly own with PT Metco Power Indonesia. The Ijen facility began operation with its first phase delivering 35 megawatts to the Java grid with our share of the facility being 17 megawatts. In 2024, we secured multiple land parcels in Nevada and Utah to support our short and long-term growth plans for geothermal energy in the U.S. This reinforces our commitment to advancing renewable energy solutions, and meeting the increasing demand for sustainable energy in these key markets. Moving to Slide 15. Subsequent to year-end, we are now signing a favorable ten year PPA with Calpine Energy Solution to provide up to 15 megawatts of clean renewable energy from our Mamox 2 geothermal power plant. We are currently negotiating PPAs for more than 250 megawatts with hyperscalers with rates exceeding $100 per megawatt hour. These agreements will secure our growth and revenues post 2028. Turning to Slide 16. Our Product segment backlog reached a record of $340 million, up 124% compared to Q4 of 2023. This increase was largely driven by the signing of a large EPC contract in New Zealand for the Timihi 2A 101 megawatt power plant and the…

Operator

Operator

Thank you. [Operator Instructions] Your first question comes from Noah Kaye with Oppenheimer. Your line is open.

Noah Kaye

Analyst · Oppenheimer. Your line is open

Good morning. Thanks for taking the questions. The first one, just how we should think about the electricity generation expectations for the Electricity segment in the portfolio embedded in the '25 guide? It looks like most of the new projects you expect to come online are really kind of tail end of the year. You mentioned some of the curtailment impacts. So it kind of looks like, we should assume a fairly modest, maybe low single-digits increase in generation year-over-year or possibly flattish. But it also looks like, that could set up perhaps something close to double-digits growth in generation in 2026. Is that a fair way to think about it? How should we assume? I don't know. Thank you.

Doron Blachar

Analyst · Oppenheimer. Your line is open

I think you got it exactly right. We didn't have any too many projects coming online at the end of '24 beginning of '25. We do see on the enhancement, the drag rate for the Enel project coming on for the end of the year and we said we do see some more curtailments in the U.S. than what we've seen in the past. So, all in all, this year as presented in the guidance, we see similar generation maybe uptick. And '26, the impact will be basically following the power plants coming online towards the end of the year '26 and all the projects that we've listed that will come on June ‘26 is the worst.

Noah Kaye

Analyst · Oppenheimer. Your line is open

Okay.

Smadar Lavi

Analyst · Oppenheimer. Your line is open

Maybe, Noah, if you don't mind, I'll add a few more things. While the curtailment in the U.S., we've been told by NV Energy that it will be towards the second half of the year, this thing can move also to the next year. It can happen from time-to-time, and then this year will be higher than that allow us to be higher end of the range. Also both in January and February, we saw lower curtailment than the ones we anticipated in Kenya. So from a generation perspective, there are a few things that can move us towards the higher end of the range. But as you said rightfully so, right now, we're seeing maybe slight up versus last year mostly as a result of the Dixie assets coming back online.

Noah Kaye

Analyst · Oppenheimer. Your line is open

Okay, perfect. Embedded in the CapEx guide is a doubling year-over-year of exploration and preliminary drilling activities. Can you just comment on that program a little bit? What would drive the increase in activities and to what extent you would consider this kind of truly early stage versus something that could help to accelerate the portfolio growth over say the next three to four years?

Assi Ginzburg

Analyst · Oppenheimer. Your line is open

Great. So we have been working to increase our exploration activity over the last year. We've changed the way we approach the exploration starting in '21. Basically, we're starting to focus on four wells, before really full size wells. We have been drilling between 8 to 12 full wells in the last two years, and that will happen in the next coming years. Each core campaign is about three to four wells per site. So this site and once the core wells campaign is successful and the work was successful, then we go to the full side at release. So it is our -- that was our plan to improve exploration. We see the PPA pricing above 100 today. So it's still very comfortable to increase significantly the exploration. And also on the permitting side, we have been able to get permitting faster for the forward campaign, which reduces the risk of the full size drilling. And we expect that with the Trump administration, we'll be able to get additional permits for full size and for constructing power plant faster. So the exploration that we are doing this year, previously and obviously in the coming years will have the growth coming in the following years. And we are focusing on many, many Greenfield that was sort of a bit lower development in the past. But nowadays, we're focusing to increase and expand the development. We also increased our staffing in the U.S. to support this growth and we do see these partners. And as we move forward, we will update the market policy once we confirm.

Noah Kaye

Analyst · Oppenheimer. Your line is open

Just to get one more in, you talked about the 250 megawatts of potential PPA contracting with and the pricing expectations there. I think you mentioned around that you would expect those to be for off takes post-2028. Can you just comment on, A, reasons for that timing, and B, any kind of sense of expected tenure length of the agreements, and possible location of agreements, is it -- would these necessarily be for centers located near production or would these perhaps be more for let's call them sort of virtual offtakes for plants located elsewhere in the country?

Doron Blachar

Analyst · Oppenheimer. Your line is open

So the reason we're talking about following '28 is if you remember three years ago, we signed a portfolio PPA with NV Energy and with the power that covers the period until '28. So we are actually looking for the duration after that. On top of that, we just talked about the exploration. We believe this Greenfield will come towards the end of 2028 or probably the beginning of 2029, some of them. So that's the place that we are looking. That's why we're talking following 2028. The one that we are talking, some of them are looking for us to sign contracts with them with the local utility. Actually, we prefer to do direct negotiation with us using the system, the network to get the electricity. We are not negotiating somebody. The system that will build the data center adjacent to our facility, but it is definitely something that we're looking across our fleet. There are places that we can actually combine the two together. But at this stage, most of the discussions we have are combining the utilities in soft form.

Operator

Operator

The next question comes from Justin Clare with Roth Capital Partners. Your line is open.

Justin Clare

Analyst · Roth Capital Partners. Your line is open

Hi. Thanks for the time. So I wanted to start out here on your, the safe harbor. You had mentioned that, you have safe harbored, all the geothermal projects with CODs through 2028. I was wondering, if you could share how many megawatts that includes. Is that just the projects that you have named in your deck, or is that a larger group of projects that would enable you to get to the 2028 targets that you have? And then, just wondering, as we move through 2025, do you think you can extend the safe harbor timeframe beyond 2028 into 2029 for geothermal, or can you extend the storage safe harbor projects beyond 2026?

Doron Blachar

Analyst · Roth Capital Partners. Your line is open

Good morning, Justin. That's a great question. As you can see from our deck between now and 2028, we need to add close to 400 megawatts of solar and geothermal. And when you look at the named project, there is much less than that, which means that all the drilling that Doron just spoke about a few minutes ago that should enable us to add somewhere around 250 megawatts between 2027 and 2028, when you talk about geothermal, we safe harbor many projects that are not on the list. Everything that we're doing co-holds already or full size wells, we also did that and we're also doing it through a sale of equipment. On the Storage side, we are also, as we speak today, looking to get four more projects in addition to what you see on the list in Texas and California and we already safe harbor two more projects that are not on the list. So there will be at least six more projects that are not on the list that will be Safe Harbor in the next already harbored in the next few months. And we will do it also through a start of construction. We will look through 2025 what else can we do in order to secure additional 2029 project. That's our goal.

Justin Clare

Analyst · Roth Capital Partners. Your line is open

Okay, great. Very helpful. And then wanted to touch on the Product segment here. Wondering in 2025, are you expecting a meaningful contribution from the $210 million contract for the New Zealand project. I think the revenue contribution for that project was initially going to be more in 2026 and 2027, but it seems like that might be moving a little bit faster than previously expected. And then just wanted to touch on the margins as well. Product segment margin in Q4, very strong at 24%. Can you talk about your gross margin expectation for the Product segment in 2025 and what you're seeing in the backlog?

Smadar Lavi

Analyst · Roth Capital Partners. Your line is open

Thanks. Great question. So when we have a very large project like that, it spans over two-and-a-half years, which started basically November when we actually got the TBDs in office to proceed. And the revenue is spread roughly evenly towards the entire period. So we see revenues from the TBD project in '25, '26 and '27, and '28, so it is spread across. Usually, we will start with engineering, then manufacturing, then the construction part. And so '26 will probably be the higher with the most revenue out of the contract, but '25 has a significant amount of revenue from TBE as well. And regarding the margin that you said, I think you should look on the annual basis. Quarter margins sometimes are impacted by specific projects that can do better or worse, depends on the situation. Q4 was a better one to have more than 24% margin. We are targeting an 18% to 20% margin within the range that we had in the '24, but that's the target that we're looking.

Operator

Operator

The next question comes from Julian Dumoulin-Smith with Jefferies. Your line is open. Hannah Velásquez: Hi, good morning. This is Hannah Velásquez on for Julien. Thanks for the update and great quarter. I had a similar question to Noah at the beginning just in terms of your assets in 2025 coming online towards the second half or later end of 2025. How does that impact USR? How would that get you potentially to the higher end of the range toward $593 million? Is any contribution expected from those assets added being operational?

Doron Blachar

Analyst · Jefferies

I think what will put us towards the higher end of the range in the Electricity segment specifically, it's not the additional of new assets. It's mainly the amount of curtailment we will experience in the U.S. and in Kenya. We've been told by NV Energy that they will replace a large T-line in the second half of the year, actually in Q4. And also, they will do some maintenance work in April. With that being said, this thing can shift between the years, and we're actually talking to them to see if they can smooth a little bit between the few years the maintenance. So that's on one hand. On the other hand, in Kenya, the plant, as you already know is very close to get to 150 megawatt, which is full capacity but we've seen a lot of curtailment during 2024. January and February, curtailment was significantly lower. So again, if we continue to see lower curtailment in Kenya throughout the year, that will be also very beneficiary and put us towards the higher end of the range. And weather is also always can impact us. I can tell you that in Q1, the weather was a little bit warmer than anticipated on the Electricity segment and we saw February, we just -- we're now in Reno, Nevada, close to it, that it was quite warm. On the other hand, when you talk about the high end of the range as a whole, as a company, on the Storage segment, the freeze that some of you guys experienced in January and February, we are very sorry for you guys, but I can tell you that for our Storage segment, it was very beneficiary. So weather can also impact us. So there is few things that can happen that can move us to the upper end of the range. It's not about CODs this year. Most of the CODs are towards the end of the year, and they will impact 2026. Hopefully, that answered the question. Hannah Velásquez: Yes, super helpful, and I'm glad to hear you all benefited from the freeze. I am in Texas. I did not. So just a follow-up question on some of the repowerings you all are going through. I know some of the other companies we look at have talked about being able to renegotiate higher off of some of these repowerings. Are you seeing a similar opportunity? And if so, how meaningful is the upside there? Thank you.

Doron Blachar

Analyst · Jefferies

Thank you. The re-contacting that we see I can tell you that the last recontacting that we did as we announced with Calpine for the Mammo G2 facility. The Mammo G2 facility ends its PPA at the end of 2026, starting 2027. The PPA with a little bit lower than $70 per megawatt hour. The PPA that we signed was over $100 and so we see a big change. We signed a couple of years ago a portfolio PPA with NV Energy in similar ranges like we had in the around $70. Today, we see prices above $100. So today, we see that the recontracting, all of them will be at higher prices than what we have today. We also see, which we haven't seen in a while and mainly with the hyperscaler willingness to look or include some indexation to pricing because that we didn't have in the past. We still not have it in the portal that we signed, but we are seeing a willingness to discuss it into the PPAs. So it will have a big impact going forward.

Operator

Operator

The next question comes from Derek Podhaizer with Piper Sandler. Your line is open.

Derek Podhaizer

Analyst · Piper Sandler. Your line is open

Hi, good morning. Maybe shifting over to Energy Storage, maybe the margins obviously fell a little bit here quarter-over-quarter. Just can you talk about the different moving pieces as far as how margins step down below the 10% range? And how should we think about it looking into 2025, puts and takes between bringing on new projects and obviously a lot of the tariffs talk out of -- coming out of China. I know a lot of your supply chain comes out of China for these energy storage units. Maybe just some help around the margin outlook and then how tariffs could be impacting this business.

Assi Ginzburg

Analyst · Piper Sandler. Your line is open

Good morning. As you can see in general, 2024, we had around 10% to 11% margin between the quarters. I would say that, in general 2024, there were no significant weather events across the fleet, and we only benefited from bottleneck, which -- there is a higher margin during the month of December. That's when it fully operated. When we look at 2025, we are experiencing more weather events already in January and February and with the increased exposure in PJM with Montelieu coming online earlier, we are seeing now for the year roughly a margin of 15% to 20% for the full year. And I will say that, we will see a higher margin than expected in Q1 because of the weather events that we experienced. Also in Q3, a bottleneck project has a better margin. In general, during Q3, the contract gives us a higher rate versus the remaining of the year. This is a new tolling agreement that we have in place already in December 2024. So we think about the year, we expect Q1 and Q3 to lead the margin and for the full year, 15% to 20% margin.

Derek Podhaizer

Analyst · Piper Sandler. Your line is open

That's all right. No, that makes sense. And then maybe just some comments around the tariffs out of China, just your supply chain with the batteries and the cells and everything else that goes into it.

Assi Ginzburg

Analyst · Piper Sandler. Your line is open

If you think about our CapEx this year, for example, on storage, total CapEx on storage is expected to be $200 million. I will say at least half of it is things that we bring from China. So it will add some cost to our basically all investment and taken into consideration. But please remember that the battery prices are down from a high of $250 per battery three years ago to $130, $120. You can even buy batteries now at $110, $100. So overall, from what the time we decided to buy the projects until now, the value of the batteries went down significantly. So 10% should not impact almost anything our decision making, and it will not stop us from continuing the growth. The key for us is to get interconnection on time, and the key for us is to continue sign a good tolling agreement to allow us to develop more projects.

Doron Blachar

Analyst · Piper Sandler. Your line is open

Got it. That's helpful. And then you recently signed an MOU with SLB in the oil and gas world to develop traditional and the next generation geothermal assets EGS. Could you give us an update on how that's progressing? Anything noteworthy you want to share, how you're viewing this MOU and how it's evolving? Thank you.

Doron Blachar

Analyst · Piper Sandler. Your line is open

So it's a very important MOU from our prescription perspective and I'm seeing also from SLB, it basically has two, two arms. On one hand, SLB, one of the largest drillers, have many customers that are drilling around the world and have access through to potential geothermal sites. They're also owning Geothermax, which is one of the consulting firms that deals with geothermal and we do hope that through their customer base and knowledge from geothermics, we will be able together to develop geothermal projects for hyperscalers or any of SLB customers. The other part is the EGS. As you know, EGS is significantly focused looking on drilling, drilling costs, drilling technologies and SLC is in the forefront of this technology and we are working with them to design exactly the framework where we will together develop an EGS solution, deal with the technology challenges that EGS has today. Between our experience in the resource management and SLB experience in the drilling, we believe that we have a good chance to build better than others on these technology challenges. And then once we do find the right economical EGS solution, start developing EGS projects. It's a process that we are starting with SLB today, these days, finalizing the framework and going forward. It's not a short, it won't have a short term impact obviously, but it hopefully will have a mid-term impact and longer term significant impact.

Operator

Operator

The next question comes from Jeff Osborne with TD Cowen. Your line is open.

Jeff Osborne

Analyst · TD Cowen. Your line is open

Yes, thank you. Good morning. Just two quick ones. On the contract renewals that you mentioned with Calpine for 15 megawatts, I think you had 88 total megawatts that were being renewed from '26 to '28. Is there any update on the cadence of that expectation? And I assume those would also be north of 100 megawatts an hour?

Doron Blachar

Analyst · TD Cowen. Your line is open

The other contracting that we have until 2028 actually will go through the NV Energy portfolio. These are contracts that will go through the NV Energy portfolio. These are contracts that have are signed with NV Energy and we signed them three years ago, the smaller, lower number around $70. However, still these are higher prices than what we have today in this contract.

Jeff Osborne

Analyst · TD Cowen. Your line is open

Got it. So no new renewals between now and 2028 and then it would require new exploration to reach the $100 price point for anything above and beyond that. Is that correct? Just want to make sure I get the timing right.

Doron Blachar

Analyst · TD Cowen. Your line is open

These were relating to Nevada. We have a -- contract in California that we signed with CPA. That contract ends in February '26, and we are waiting to the final signature from CPA that should happen Again, significantly higher than what we have discussed.

Jeff Osborne

Analyst · TD Cowen. Your line is open

Perfect. And my last question, was, I forget what year it was, maybe '22 or '23, you made an acquisition that had a power line associated with it. I believe you're trying to sell that power line or have been for a while. Is there any update on that and what the potential proceeds could be?

Doron Blachar

Analyst · TD Cowen. Your line is open

We have off road power line connected to [Bishop] the control substation, which is we're waiting for an upgrade. We are not a transmission company. And as you said, we are looking to sell it. We are in the process. And obviously, since we're in the middle of the process, I cannot share some commercial details, but this is definitely a process that we're doing and we plan to finalize it this year.

Jeff Osborne

Analyst · TD Cowen. Your line is open

Perfect. And just a clarification, I think you mentioned in the prepared remarks, but I failed to hear correctly. Did you name the particular NV Energy project that was being curtailed that's leading to the electricity shortfall in 2025?

Doron Blachar

Analyst · TD Cowen. Your line is open

I don't think we named it, but it's mainly in Venezuela. It's the Lagunas area, Lagunas Hills.

Operator

Operator

The next question comes from Ryan Levine with Citigroup. Your line is open.

Ryan Levine

Analyst · Citigroup. Your line is open

Thanks for taking my questions. I guess two questions. What's changed from the company's prior stance to go through a regulated utility to this direct PPA with the hyperscaler? And then related, another IPP or another power company indicated $70 to $98 per megawatt hour range for hyperscaler deals that did include capacity or ancillary service. Can you provide some color, or is there anything that you're able to share as to what's included with the north of a $100 per megawatt hour number?

Doron Blachar

Analyst · Citigroup. Your line is open

First of all, we are negotiating with hyperscaler, as I said directly and also through the utility company. So we're looking at both alternatives. We're trying to maximize the growth and profitability of the company between these two aspects. When we signed the PPA, we basically said, with the PPA all the attributes of the renewable energy, including the rest and everything. So we have one customer, one price that deals with everything. Maybe that's the difference. I don't know who mentioned $70 to $90, but maybe that's part of the difference. But that's how we see it. There are other technologies, our technology is emission free. Other technologies have emission that also might have an impact on the price people are willing to pay. New power plants get -- we see -- tend to get higher pricing than recontracting many times. So there are various issues that can impact the pricing of the PPA, but what we said is with the pricing that we are negotiating above $100.

Ryan Levine

Analyst · Citigroup. Your line is open

Okay. Appreciate that. And just in terms of duration, I think it was previously mentioned or clarified, but do those duration conversations include all attributes of the power that you're selling? I mean, does this include capacity, some of the racks or any type of environmental attributes? And are they all likely to be similar in duration or any color you could share on that front?

Doron Blachar

Analyst · Citigroup. Your line is open

Yes, all the PPA that we have said all the attributes at the same time period time of the PPA. So the PPA is 10 years. It could be for 10 years, 15 or 20. And the duration of the PPA is based on the negotiations we have with a specific customer, usually ranging between 10 to 20 years.

Operator

Operator

This concludes the question-and-answer session. I'll turn it to CEO, Doron Blachar for closing remarks.

Doron Blachar

Analyst · Oppenheimer. Your line is open

Thank you all for joining us today. 2024 was another very good year for Ormat. We see the significant increased demand in The U.S. and globally, and we are fully committed to continue to focus on this growth and make sure that this is a profitable growth going forward. Thank you, all.

Operator

Operator

This concludes today's conference call. Thank you for joining. You may now disconnect.