Steve McGibbon
Analyst · Jake Sekelsky of Alliance Global Partners
Thank you, Peter. Exploration activity continued during Q3 across all projects in Canada, the United States and Argentina with total spending of $6.2 million. Our principal exploration goal remains to cost-effectively make discoveries and to extend deposits adjacent to our existing operations in order to contribute to near to medium-term gold production growth. To that end, we had solid results from the recent quarter on which to build. Firstly, I will update on the work at our 49% owned San José property operated by our joint venture partner, Hochschild Mining. 100% basis, San José exploration was $2.7 million in Q3 and on track to meet the 2021 exploration budget of $9.3 million. San José has been in operation since 2007. Exploration activities at San José located in Santa Cruz province, we’re focused on the telco Norte and Savadia near-mine targets, exploration drilling in these areas returned encouraging results, including 6.3 meters of 44.4 grams per tonne gold in the Betania vein, 1.9 meters from 14.5 grams per tonne gold and 342 grams per tonne silver in Jimena vein, and 12.3 meters of 14.9 grams per tonne gold and 1,381 grams per tonne silver in the Amelia vein. Drilling is expected to continue through Q4 2021. The Q3 brownfield program at San José carried out 6,900 meters of drilling. Adding further high-grade inferred resources during the quarter and bringing the inferred resources adding year-to-date to approximately 121,000 GEOs, which is 9.1 million silver equivalent ounces. Longer term, we recognize the tremendous exploration potential of this property and province. Iman’s Cerro Negro mine is only 20 kilometers away and largely surrounded by our nearly 700,000 acre property that remains under stored. As the Gold Bar Mine and properties in Nevada, and in Q3 2021 for the nine months ended September 30, 2021, we incurred $1 million and $2.7 million in exploration, respectively, at both the Gold Bar Mine and Tonkin mine areas. At the Gold Bar Mine area, we are committed to targeting potential unmined zones and extending known mineral structures. Our exploration efforts are focused on derisking the geological and metallurgical models and expanding resources to replace mining depletion. Our Tonkin property sits immediately south of world-class Carlisle deposits being developed by Barrick Gold. Tonkin has not seen exploration activity, while Gold Bar was being built and production stabilized, but we recognize the long-term value creation that could be realized by committing exploration balance here. During the three months ended September 30, drilling was aggregated at the Tonkin Rooster deposit, located some 25 miles north of Gold Bar, which generated positive initial results starting from surface, including oxide dominant drill intercepts of 1 gram per tonne gold over 57.9 meters. 10.65 grams per tonne gold over 71.6 years, with both likely amenable to heap leaching. The Rooster deposit is structurally complex and includes mineralization in both lower plate lime stones and other plate shirts and siltstones. The oxide material has the same host rocks as we see at Gold Bar, whereas the more refractory style mineralization, which can be very high-grade is hosted in the conformation, also cost to multimillion ounce or deposits at Turquoise Ridge. We are very encouraged by intercepts that include hole TS208 at 3.23 grams per tonne gold over 38.1 meters and locally grading over 14 grams per ton. An ongoing program of remapping, relogging historic drill holes and producing an updated geological model by year-end will establish a basis for a stronger commitment to talking, including further defining oxide resources that could potentially be processed at Gold Bar. At the Fox Complex in Canada, we incurred $4.2 million in Q3 exploration expenditures in 2021. The majority of which was deployed at the stock property with lesser focus at Grey Fox. The stock property includes a historic stock mine, current mineral resources at stock needs and an important 2019 gold discovery at Stock West. Our fast complex processing plant also resides at stock. Our overall strategy in 2021 as stock includes delineation and expansion of non-mineralization of Stock West and Stock Mine in support of production will be detailed in our upcoming Fox Complex PEA. Also, we are ranking and drill testing targets likely to host the next important discovery on the property. In Q3 2021, a total of 19,400 meters of surface exploration drilling was completed with potentially important ramifications. Our particular interest was hole S21-202, which returned 4.3 grams per tonne gold over 21 meters have estimated it. This hole is a 200 meters from the Stock West discovery area and also resides some 250 meters above our S19-95, 27.2 grams per tonne gold over seven years in 2019. These holes are located at the projected intersection of the Stock West east plunge and the Stock Mine west plunge, and they will command further drilling in 2022. These intercepts which have far more similarities to the geometries and grades being successfully mined at from versus Black Fox are very exciting to us. Additional discovery potential is being assessed in the footwall of the Stock Mine, where we believe the host unit for the Stock West deposit called the [indiscernible] exists. That has been very poorly tested in the past. A discovery here would be very beneficial, owing to the proximity of underground infrastructure. Fox complex expansion, a PEA summary, an independent engineering group has been engaged to complete the PEA on the Fox, Grey Fox, Black Fox, pruned stock and filler resources using our existing centralized milling capacity of stock. The objective is to outline a potential low cost, near-term business case to increase production and mine life for the Fox Complex. The PEA activities for the nine months ended September 30 included ongoing drilling, modeling and remuneration, baseline work to support permitting, environmental, mine planning and trade-off studies, metallurgical assessment reviews and process flow sheet assessments and preliminary cash flow analysis. The PEA will include the resource estimates and an underground design, which are expected to be completed in late -- expected to be completed in late Q4 this year. Thank you. And I will turn the presentation back to Rob.