Sanjeev Aggarwal
Analyst · Richard Shannon of Craig-Hallum
Thank you, Monica, and thanks, everyone, for joining us on the call today. We are pleased to report second quarter revenue of $18.7 million and non-GAAP EPS of $0.11. These results reflect the highest revenue quarter in Everspin's history, which exceeded our guidance range on both the top and bottom line, driven by strong product revenue growth and the $40 million agreement we announced with a U.S. prime contractor on our last earnings call. During the quarter, we began to recognize nonproduct revenue under the 2.5-year agreement. As a reminder, Everspin is a subcontractor on an existing prime contract and is providing engineering services to develop and qualify Toggle MRAM process technology capabilities for U.S. defense industrial-based customers. In addition to this new contract, we also recorded strong product revenue growth, which rose 38% year-over-year and was up 9% sequentially. This growth was driven by strength in industrial automation, energy management and aerospace and defense applications. Growth in Industrial and Energy Management was driven by a continued recovery in customer demand, particularly in Japan and Europe, respectively. In aerospace and defense, we saw continued broad-based growth across our customer base, including several low earth orbit customers, who are expanding the mission profile, where Everspin MRAM delivers long-term reliability for mission-critical applications. Recently, Astro Digital selected Everspin's PERSYST 64-megabit STT-MRAM for use on an upcoming Raven Bus Geosynchronous Earth Orbit or GEO satellite mission. Our MRAM is deployed as the primary fail-safe memory for the system boot memory, which stores the essential code needed in case of power loss and fast access to initialize spacecraft electronics during start-up or recovery. As we noted last quarter, our $14.6 million contract with a DoD contractor to develop a sustainment plan for our MRAM manufacturing facilities to provide continuous onshore MRAM capabilities to their aerospace and defense customers is beginning to wind down. In the second quarter, we recognized $0.5 million in other income related to this contract and $13.3 million to date. We expect this business to continue to wind down over the coming quarters with estimated completion in the first half of 2027. Turning to some of our product development efforts, our first UNISYST family of MRAM products, the 256-megabit xSPI is on schedule to tape out later this year. As a reminder, this is a test chip designed on 16-nanometer FinFET CMOS at TSMC. Engineering samples are expected to be available in early 2027 with ramp to production later in the year. The UNISYST family of products will serve the high-density stand-alone NOR Flash market, which will expand our addressable market by approximately $3 billion. Our goal is to capture 5% to 10% of this market in the early years and then grow further. We are pleased to announce that our high-density 128 megabit and 256-megabit xSPI high-reliability parts were made available to our customers ahead of schedule. During the second quarter, we released 128-megabit high reliability parts to production. Subsequent to the quarter end, we released all SKUs of xSPI 256 megabit density to production, including high reliability parts. Customers now have these parts on hand to evaluate them in their designs. We kicked off our project with Microchip in April to build MRAM capabilities in their Gresham, Oregon fab. This project comprises 2 phases with the first phase focused on Toggle MRAM and the second phase on STT-MRAM. We are finalizing the installation of unique MRAM equipment and completing process gap analysis, if any, for the non-MRAM equipment. This project is on schedule with a goal to deliver the first qualified silicon in 18 to 24 months from project kickoff. We continue to see strong growth across our existing business, while executing on our product pipeline and developing solutions that will further expand Everspin's addressable market and drive long-term growth. One of these future opportunities is focused on expanding our TAM in the data center market, and we are planning to introduce some new products over the next 3 years based on the Compute Express Link or CXL interface. To provide a little background, in the memory hierarchy, there is 100x to 1,000x latency gap between storage with a latency of approximately 100 microseconds and main memory with a latency of approximately 100 nanoseconds. CXL attached random access memory can provide approximately 100x lower latency when compared to SSD solutions available today. We continue to advance our development work on CXL interface-based MRAM solutions, which will address the demand for nanosecond class persistent memory solutions, bringing storage closer to XPUs, enhancing compute and power efficiency, resulting in significant overall cost savings. We are targeting to improve XPU utilization from 60% to 70% currently to as much as 90% to 95%, especially from small rights, for example, meta or log data. We are currently working on developing proof-of-concept demo vehicles to validate the expected gains. Subsequent to quarter end, we signed a contract with a high-performance data interface and controller company to develop and provide CXL controller IP for MRAM. We are collaborating on an AMD UltraScale plus FPGA-based platform using the CXL controller IP under development to connect to Everspin MRAM DIMMs dual in-line memory modules. We plan to demonstrate this solution at the SNIA Developers Conference, or SDC in September. We also recently announced that we signed a memorandum of understanding with MaxLinear to evaluate the use of Everspin CXL attached MRAM with MaxLinear storage accelerators for next-generation storage and acceleration architectures. Together, we will assess opportunities to apply persistent bytaccessible, low-latency MRAM to storage functions such as metadata, log data, write buffers and caches with the goal of improving system performance, reliability, power efficiency and data persistence in next-generation storage architectures. By combining Everspin's industry-leading MRAM with MaxLinear's storage accelerators, we believe we can enable new persistent memory solutions for hyperscale cloud, AI infrastructure and enterprise Tier 1 customers. I will now turn it over to our CFO, Bill Cooper, who will walk you through our second quarter financials and third quarter 2026 guidance. Bill?