Yes. So basically, we're gathering all the geologic data, the geotechnical data, the assays, obviously, to do a DSO, direct shipping ore based feasibility study. And first step is to get the geologic model put together, the resource model update that, obviously, we're targeting 400,000 to 500,000 ounces of gold grading in the, I'll say, 10 to 15, 10- to 14-gram range. Obviously, it's an underground mine. It was historically an underground mine, produced 0.25 million ounces at very high grades. We are going to look at -- they use hand-sorting back in the day. We will take a look at ore sorting and probably, obviously, more of a modern version of it with these ore sorters that work at incredibly high speeds, and they can sort on a lot of different variables. So that is something we'll take a look at because, obviously, transportation is a significant amount of the costs in a DSO model. So if you can simply put the geology here is a quartz vein in a granodiorite, and the granodiorite is rock that doesn't have any gold in it. If you can mine something that's 2, 3 meters wide and a meter of that is granodiorite, you can get rid of it or get rid of 50% of it with the ore sorters, you're -- that much -- you've upgraded your average grade, your diluted mine grade and you're not transporting that material. So yes, we've got a lot of work to do, but the first step is gathering all the -- getting the drill spacing down. We're drilling on about 25-meter centers. And then we do fan shots. So between the -- each time we're hitting the quartz vein, we're probably in the neighborhood of 10 to 15 meters apart. So this is a -- this will be measured indicated resource, and we'll be able to develop a mine plan around that. And as I said, the other metallurgy here is like super simple. It's quartz and gold, a very small amount of sulfide. We've talked about the possibility of taking it to the Fort Knox mill. That's an obvious choice. I think it's fair to say that Fort Knox is interested. They still have a mill that has plenty of capacity in it. But there are other options that we are evaluating as well. So -- that's kind of where we're at. Give us -- I think the drilling will take place between now, I mean we've been drilling, obviously, the surface drilling 2 rigs. The underground rig will start back up at the end of the month. And let's see what else. We'll be drilling until about March of next year. And obviously, working on all the engineering and what have you work between now and then. And don't have a date on when we'll have a feasibility study done, but it will be in 2027.