Jim Grech
Analyst · Jefferies
Thanks, Kala, and good morning, everyone. Peabody's first quarter was marked by a number of accomplishments amid a positive time for both thermal and metallurgical coal markets. We delivered better-than-expected volumes, pricing and costs in our Seaborne Thermal segment, supported by sharply higher global LNG prices in March. Our U.S. thermal coal volumes continued at a strong pace, driven by continued strong electricity demand. And across our seaborne met portfolio, operations performed in line with expectations, with the notable exception of Centurion. Focusing on our top priority, Centurion, I'll provide a thorough update of where we are today. As you know, as part of our commissioning of equipment in February, we encountered temporary mechanical and electrical issues. While those challenges were resolved, the disruptions led to a slower cutting speed, which in turn contributed to roof control conditions. Maintaining roof integrity is critical to sustaining optimal cutting speeds. As a result, early in the ramp-up, progress was slower than we were anticipating even after resolution of the mechanical and electrical issues. Importantly, once the mechanical and electrical issues were resolved, the team implemented a comprehensive response plan centered on proactive strata management and disciplined execution with safety as a top priority. We have brought together a highly experienced group of engineering and operational personnel from across the platform to address these challenges. Since that time, we have been systematically working through what was at its core an iterative cycle of slower equipment performance affecting roof conditions. Over the past several weeks, we have taken deliberate steps to stabilize the operation by reinforcing the roof and face, realigning shields and improving overall cutting conditions. Naturally, every mine is unique with different geology, equipment and operating conditions, and it has taken some time to apply the right solutions at Centurion. While this has required a longer-than-anticipated commissioning period, it ensures that safety remains paramount as we work toward durable solutions. Our safety performance has remained strong, and I want to be clear that we have had no carbon monoxide events, no methane issues, no ignition events and no regulatory challenges. While we are not yet at full cutting speed, the key remediation steps are largely in place, and we are encouraged by what we're seeing. We believe the remaining temporary headwinds are largely confined to the second quarter, with performance in the back half of 2026 expected to reflect a return to full longwall production rates. We expect to sell roughly 300,000 tons in the second quarter, reflecting strong June production, but a traditional lag in converting production at the mine into sales at the port. Additionally, the 7-week longwall move that had been planned for the fourth quarter is now expected to shift into early 2027, which will support stronger production in the second half of this year. As a result, our full year sales outlook for Centurion is now 2.5 million tons compared to our original expectation of 3.5 million tons. With that said, we've updated full year met segment volumes to reflect the 1 million ton decrease and increased cost to a range of $123 to $133 per ton. Stepping back, Centurion remains one of the most attractive assets in our portfolio with a strong position on realized pricing, cost, structure and mine life. In addition to our coal mining and marketing business, we continue to make progress in our Peabody development initiatives in recent months, focused on unlocking additional value from our vast array of land, reserves, operations and commercial relationships. When we spoke last quarter, we had been recommended for a $6.25 million grant from the Wyoming Energy Authority, and that grant was awarded later in the first quarter. Peabody is now advancing initial plans for the pilot plant to process rare earth elements using PRB coal as feedstock. We also continue to advance additional opportunities related to rare earths and critical minerals. We have a particular focus on germanium, where we see good concentrations, strong end market engagement and favorable supply-demand dynamics. For proprietary reasons, we'll need to keep details at this level for now. I'm also pleased to note that initial test shipment is occurring this quarter for West Coast thermal coal exports. We have sent PRB coal from our North Antelope Rochelle Mine, transported by Union Pacific Rail to Mexico's Port of Guaymas, which is being loaded for export to an Asian customer. This test run reflects close coordination with U.S. and Mexican governments, port authorities and logistics partners. It demonstrates the potential of a West Coast export route for PRB coal. While this is a proof-of-concept shipment, Guaymas has infrastructure that could support additional volumes over time. More broadly, this effort underscores Peabody's ability to connect the largest coal basin in the Western Hemisphere with the largest global demand center for thermal coal imports. We would also note that recent U.S. policy actions continue to affirm the value of reliable coal supply chains and baseload generation capacity to national security and grid resilience priorities. That follows an executive order during the quarter that directed U.S. defense facilities to purchase power from coal fuel generation. We view these moves as highly constructive, both symbolically and practically for longer term coal use in the U.S. For more on the U.S. and global supply-demand fundamentals, I'll turn things over to our Chief Commercial Officer, Malcolm Roberts.