Well, large part of that, Josh, is just simply moving towards the central portion of the field and progressively moving there. So we had agreed early on with the settlement that we would start in the Far West. We knew it was not in the center of the field. We then moved up structure to the 14-36 pad, and that was offsetting a DST that was quite exciting in some conventional logs. And so we knew we were potentially in a better location. We proved that up with the 903, 900-barrel a day wells. And then we knew moving south that we would move into the heart of the thicker -- the better permeability trend really in the core of the field. The exciting thing there is now, as you say, with this new technology with the 4 lateral same meterage as the 8 lateral 1-mile wells, these 4 lateral 2-mile wells is giving us the ability to do some things from a social standpoint within the settlement to undershoot roads, little hamlets and things and really get into full development mode. But also, when you're drilling in this consistent reservoir and this strong -- this clean of a sand, once you're on bottom, you tend to generate some really strong efficiencies with your ROPs while drilling. So we were able to drill these wells not only for better costs but because we're in the heart of the trend -- and I think also, we're waiting for our super pad facilities to be completed. So we've got these completed and the wells are ready to go. We did this during breakup, which was a bit of a risk, but the configuration of getting the facilities done first, bringing these wells on, these new 4 lateral wells on these super pads with the full facilities in place allows us to move to production mode with less hiccups, if you will, in the first 30 to 60 to 90 days, and that's exactly what the team did. There is quite a large amount of inventory that's just like this. So for example, on these 3 wells 1,100 barrels a day, we're bringing on the other 3 on the same pad right now. All these are 2Q wells. None of them came on really in Q1. So this is all Q2 and beyond impact. But we've got another 3 right now. And I would say the core of the play is probably a good 20 sections of land in that area, which is multiply that by 4, and that's a lot of wells. That's a good 80 wells. So we need to keep building out from the core now, and we will do that. But we are incredibly excited that we've now got a new pacesetter for the entire basin on these 1,100 barrel a day wells.