Sebastiaan Bock
Analyst · UBS
Thank you, Mark, and good morning, everyone. Barrick International produced 319,000 ounces in the third quarter, up 6% on Q2, with strong performance at Loulo-Gounkoto, Kibali, and Bulyanhulu more than offsetting weather disruptions at Veladero and Porgera. The increase came from 2 places. Loulo-Gounkoto continued to perform well, up 16% on higher throughput and grade, with mining and processing consistently running ahead of the original restart plan. And Kibali, up 20%, delivered its highest quarterly production since Q4 2023 as the underground brought more ore at higher grades. Moving to Tanzania. Bulyanhulu stepped up again as the Upper West development resulted in greater mining flexibility. North Mara was up on the quarter despite an extended plant shutdown and some power instability. Veladero and Porgera were affected by El Niño weather events. Severe winter storms suspended operations at Veladero on several occasions, while drought-related water shortages at Porgera limited plant operating rates. We've seen these conditions continue into early Q4. We manage Barrick International as a portfolio, and the performance across the rest of the operations keep us on track for our full year gold production guidance. On costs, higher volumes at Kibali and Bulyanhulu brought unit costs down. Veladero, Porgera, and North Mara went the other way, with impacts from the storms adding to Veladero's costs. Royalties and fuel remain the main pressures year-to-date. Despite that, Barrick International generated over $800 million of attributable adjusted EBITDA from the gold operations in the quarter with an adjusted EBITDA margin of 59%. Moving to copper. Production remains on track for full year guidance. We produced 50,000 tonnes in the quarter, with Lumwana completing a planned mill reline in late September, which sets us up for a clean run through the fourth quarter. Our other copper operations were flat on a combined basis, with higher grades and recoveries at Jabal Sayid offsetting lower throughput and grades at Zaldívar. Costs were higher in the quarter, driven mainly by diesel prices, local currency appreciation, higher royalties on the stronger copper price, and some additional waste stripping on top. For the full year, we expect our copper cost to be around the top end of the range, given the same diesel and currency pressures. The Lumwana expansion will take production to 240,000 tonnes a year with a mine life of more than 30 years, and it remains on track for first copper from the expansion at the end of Q1 2028. Since the start of the project, we've spent $795 million on the expansion, and total expected project capital remains on target at $2 billion. Procurement of all major long lead equipment is complete. The mill building, which sits on our critical path, is scheduled for completion in Q4. To close, quarter 3 shows the portfolio delivering where we control the variables and doing what we can to mitigate the external pressures on costs. We remain on track to deliver full year production in line with guidance for both gold and copper. With that, I'll hand over to Helen.