Alberto Calderon
Analyst · SPG Securities. Please go ahead
Thank you, Stewart. Before we go to the numbers, I’ll start with the safety. After three years with no fatalities, at our managed operations, we received the tragic reminder in May that we're only as good as our last day with no serious injury. [Indiscernible] a colleague and father of three who work for a drilling contractor at Geita lost his life with the light motor vehicle he was driving overturned after he lost control driving down a steep hill. Marcelo Godoy, our CTO completed an in-depth investigation into the incident, which identified clear steps to do everything we can, so that there is no repeat going into the future. Our thoughts are with Albert’s family and loved ones as we mourn his loss. I have led a series of town hall meetings across our business over the past few weeks reflecting on the learnings from this tradegy and leading a campaign to ensure continuous focus on the very few critical controls needed to eliminate what we call high consequence low frequency events like this. We continue to invest considerable resources in understanding the lure causes of all accidents including high potential incidents or near misses in order to prevent recurrences. This process is a strong indicator of the strength of our safety culture and the effectiveness of our systems and provides a good foundation of which to continue working to realize our ultimate goal of zero harm. Next slide, before we turn to the numbers in detail, I'm very pleased to report a strong operating and financial results for the half year. This results show the hard work that has been done by so many to improve the fundamentals of our business to drive productivity benefits and to manage costs. Most of our Tier-1 assets recorded a solid performance driven both by higher tons and higher grades mined. At the Tier-2 mines we continue to drive full potential initiatives to enhance asset performance. Now that we are well into the full potential execution, we have seen our costs trend lower. We will talk about that later. We are the only gold major that has reported so far to post an improvement in cash costs at the half, that means that we're able to capture the benefit of stronger gold prices. Revenue is up more than $400 million on year, all of which has flowed directly into the bottom-line. We are building a strong operating momentum into the second half when we expect to deliver not only further production and cost improvements, but significantly stronger cash flows. So, to go into the numbers, production was up 2% year-on-year driven by strong performance from our key assets. That result was significantly aided by a strong Q2 where production was 12% higher versus the first quarter. This was driven by Australia’s strong improvements following the biblical floating in March and Siguiri bouncing back from the recovery challenges that hurt Q1 production. Brazil's turnaround is a clear highlight with a cash flow turnaround that was barely imaginable a year ago. Our cash costs were 1% lower year-on-year as I mentioned a moment ago. This is not luck, in fact the improvement was achieved despite the stiff headwinds we faced in Australia and Guinea in Q1 and it is a testament to our production report potential program, which is yielding much of the benefit we expected and we believe more this is yet to come. On the back of these production and cost improvements, we are starting to see the leverage to a higher gold price that has been so rare across the sector during previous up cycles in the gold market. We reported a 65% increase in EBITDA to $1.12 billion and more importantly, a swing of more than $400 million turn in free cash flow, which came in at $206 million versus an outflow of $205 million last year. This was well up ahead of the higher price due to improvements in both ounces sold and costs. Most encouraging is that we anticipate a stronger second half. With that in mind, we have declared a dividend that reflects that confidence. Gillian will cover that in more detail but it is clear with that we have the conviction of the consistency of our operating performance and a commitment to ensure shareholders see improved returns. This of course underpinning by confidence in our balance sheet. Liquidity is very strong, gearing is low even while we invest in our existing portfolio and growth pipeline and we are well on track to achieve guidance. As I said in May, we were focused during Q2 recovering from the obvious Q1 challenges that caused us significant ounces in Australia and Guinea. You can hear, you can see the extent of the flooding that hit our Australian operations in March. Pits an infrastructure were flooded at Tropicana and crucially the 400 kilometer access road to this remote site at significant stretches underwater. This took some time to dry and cure sufficiently before it could reopen. Remedial works were completed in Q2 and we started operations successfully. This in turn saw improved production at both sites although ongoing rate fall during Q2 caused intermittent interruption to our supply lines into Tropicana, sometimes hampering our ability to restock consumables and another important items, Nonetheless, we expect to recover a significant portion of the lost production in the second half. I spoke about the challenges we saw at Siguiri in Q1, low digger availabilities, poor availability of spares and most of all the steep drop in recoveries. We have improved maintenance, address spare inventories and saw 38% bump in our tons in Q2. A new excavator has also been delivered which will help us to continue that improving trajectory in Q2. Metallurgical recovery stabilized at around 87% in Q2, up from the low 70s in Q1. In fact, we have seen average recoveries about 90% in July. We are looking at the work that can be done to improve carbon management and oxygen deficiency in the plant, which will help maintain and potentially improve these strong recoveries even when we introduced the challenging BD ore to the plant. The good news is that we're in no rush to do that given the ability to source ore from alternative pits. So we may only need the bid wining ore in 2026 and we will then be well prepared to process it. Brazil picture, it's probably not even us probably would have imagined such a turnaround. It's hard to overstate it that what has happened in the past 12 months ynder the new leadership we appointed last year. The team delivered a 15% year-on-year increasing gold production in H1 and 19% reduction in cash costs year-on-year. The free cash outflow of $140 million during the first half of last year, which hammered our half year result has turned into a $53 million inflow during the first half of this year. As you can see on the waterfall, this was not simply a gold price story, but rather was driven by the controllable factors, which we manage across the business. More extraordinary is that this cash flow result was achieved under the wake of a roughly $200 ounce discount for every ounce of concentrate we sold from Cuiaba, when that [Indiscernible] has been suspended. The very good news is that the path is now clear to restart that facility during the second half, which will allow us to resume refined gold production and start to recapture the full margin once again. Obuasi’s Q2 production was a steady 54,000 ounces. The v30 reamer continues to work as expected helping to safely push underground ore volumes for the larger open stopes. We’ve seen better results with ore tons in Q2 averaging around 97,000 per month 6% up in Q1, if you compare H1 to 2023 to H1 2024, we’re up 12%. We are however experiencing some challenges in Block 8, a very mature block with fewer suitable working areas, more congestion and has less flexibility that we’d like to have. And probably with the significant volatility in its grade in this last part of block 8. That impacted mine grades, particularly during April and May, the zones that we were mining. We did have however reach equivalent analyzed production of 300,000 in June and are on track to surpass that this month. Consequently, we expect to reach a production for the year around the lower end of guidance. We also anticipate - and this is probably the most important thing, strong catch generation from Block C during this ramp up. A solid cash - free cash for the year, surpassing $18 million, demonstrating a very strong cash flow potential. As I've said before, the real price that will is coming relatively soon lies on the higher grade block 10. This is virgin ground with average grades about eight in addition in later years there is Block 11 with grades about 17 grams to provide another kicker. A critical path to bring Block 10 into production is getting ventilation infrastructure into the right place, which we expect towards the Q2 of next year. We'll see that in the next slide. This will allow us to ramp up Block 10 and also to bring in Block 1 getting us comfortably over 300,000 ounces next year. Turning to the trial of the underhand drift and fill mining method. This has gone to plan. The concept is proven in the trial area with paste strength good and curing time down to 14 days. We will continue to ramp this over the rest of this year as we established a new full scale - full scale site in Block 8 lower. So, phase 3 of our projects and of construction projects achieved 89% of overall completion by the end of Q2 2024. Dewatering has been completed to the shaft bottom and construction has started on the dam and pump station building. The settlement of the project is expected to add another 6,000 tons per day hosting capacity for the mine, refurbishment of the KMS shaft is on track for completion by the end of 2024 and the added flexibility a significant benefit. At the same time that KMVS vent shaft will allow us to ramp up volumes from the Block 10. More specifically, we will be able to develop several mining fronts on Block 10 and onewhich will help optimize the significant infrastructure we will have ready and hence surpass the 400,000 level we have spoken in the past. We plan to host a site visit to Obuasi ahead of next year's in Dhaba [Ph] where we'll be able to showcase the huge strides made in the infrastructure development that will enable this access to mining areas and we will also provide an expected ramp up during next five years of Obuasi. Full asset potential continues to yield results across the portfolio at Sunrise Dam, despite the weather challenges in year one, underground tons in Q2 stepped back up and around 220,000 per month. The better haulage performance was underpinned by improvements in stope availability and fleet utilization. We'll look to sustain these levels in 2024 thereafter drive the next step changes to the focal asset performance target. We have completed all of our assets and are now starting a second wave of FAP starting again with Sunrise, where we have already identified more than $100 million of potential benefits. Full asset potential will continue to be at the heart of our improvements in productivity and has reductions in our cash cost. As I showed earlier, recoveries at Siguiri are up after interventions in Q1. We are excluded the Guinea ore from the blend and ore is being sourced from alternative deposits stabilizing plant performance. We will look to make low CapEx modifications to the plant with a specific focus on management of carbon and oxygen levels. Educating continues to perform very well. We've driven improvements in drill and blasts, as well as processes to get better fragmentation. We’ve optimized the load and haul process to get better ore delivery to the plant and we sharpened our maintenance practices to achieve better overall equipment availability. At Geita, underground ore tons from Nyankanga are ahead of our full asset potential targets. We're delivering backfield directly to stopes via drills from surface rather than using trucks. This in turn has debottlecked our underground materials handling capacity and improved overall stope availability. Apart from the benefits in the incremental EBITDA, we've been able to generate, the true value of this program goes beyond dollars and ounces. Over the past two years, the full asset potential program has given us significantly more resilient to help offset inflation and counter that impact of production interruptions across our portfolio. I'll tell you the same thing that I tell our employees and my Board, which is that the proof in the numbers. The proof is in the bottom-line. It’s our ability to meet and to sustain and improve bottom-line that matters. Improvements in bottom-line and that's what this is $464 million of improvements of incremental EBITDA in the past two years. On regarding of the future, we have a strong pipeline of organic options. We are executing on Obuasi that will give us additional medium-term ounces. Nevada is a game-changer. I will talk more about it now. We see the region producing as many as 500,000 ounce over a multi-year period at Tier-1 cost and longer term, we have a world-class copper gold deposit in Quebradona, which gives us optionality and exposure to the energy transition. This is what I think a very nice graph and this is different we put new information. It continues, Merlin continues to deliver strong asset results. Further supporting this is a high-grade world-class ore body. In this section you can see the extent and size of the deposit along with some very exciting new intercepts which continued to upgrade the quality of this impressive ore body. 66,000 meters - 66 kilometers of mainly infield drilling we’re completing during the first half. You will obviously look to this cross-section in your own time, but I’d just like to highlight some of the high-grade intercepts over a significant widths. So you can see there a 144 meters at 10.53 grams per ton. You can see 30.4 meters at 8.53, you can see 190 meters at 5.2. You can see 160 meters at 5.85. You can see 50 meters at 3.9. So it is - all of this is - has all of the signs of another truly Tier-1 deposits in North America. The PFS program to expand, Silicon is expected to be completed by mid-2025. And don’t know it's full progr where permitting is underway, engineering reached the 30% completion milestone in Q2 2024, in line with the plan engineering schedule and we will continue to provide further updates in Q3. Okay, this is now to Gillian.